Jump to content

Saz

Members
  • Posts

    111
  • Joined

  • Last visited

Posts posted by Saz

  1. In an ideal world (yes it probably won't happen) I would like to see Vengeance as a pre-ride where you battle the swarm of aliens, then some sort of storyline saying you have failed to beat them and then a sub-terra style ride followed by a walk through alien life form models and strobe lights in order to get out.

    Probably won't happen though!

    If Thorpe gets Vengeance next year, I reckon it would be given the Sub-Terra treatment - I.e. a pre show and some sort of after show. It would be the only way to boost the overall attraction's throughput. How many people can ride Vengeance at once? Can't be much over thirty.

  2. I think we're getting one of three options:

    1. Vengeance placed in the Pirates 4D/Time Voyagers theatre.

    2. Vengeance placed in a new building where the hospitality tent opposite Swarm is currently situated.

    3. A Sub-Terra style ride placed in a new building where the hospitality tent opposite Swarm is currently situated.

    I would be extremely surprised if one of these didn't happen. Options 1 and 2 seem the most likely I think, but option 3 would be great.

  3. Doesn't the MTDP say the little game zone by the Fish and Chip area is a potential flat spot?

    If so, could it be possible to utilise the area for an attraction that could go in P4D? For example, having it as a queue area then have a bridge to the now-theatre for the ride? Or perhaps even ditch the chippy? Or would that be farfetched?

    I too have heard rumours of an attraction going in the theatre, but size and a suitable queue area large enough would be some of my concerns...

    Just outta interest, what's the footprint of Venegence?

    I certainly think that this is an option for next year. Looking at the old Pirates 4D/Time Voyagers queue area a couple of days ago, I reckon they could easily fit a cattlepen queue in this space, but I like the idea of a bridge connecting to another queue area where the game zone is currently situated. If Vengeance is indeed moving to Thorpe next year, (which at the moment seems highly likely) it would easily fit in the current theatre and there would probably be enough space for a pre-show room to explain whatever back story Merlin decide on. In regards to what story/film Merlin might decide to go for, I would reckon something to do with a pirate ghost ship with guests having to shoot attacking pirate ghosts perhaps.

  4. ^ I think it's the most likely option for next year to be honest. It was probably be called something uninspiring such as Swarm: Genesis and will be located where the white marquee tent is at the moment - in a shipping container of course. ;) Perhaps Merlin did a three park deal with ABC on drop tower rides or something... four if you count the new Extremis at the new London Dungeons next year.

  5. Just a quick update...The pass which I lost was turned in at my uni soon after my first post, but I had already contacted Merlin regarding a new pass. Merlin said they would charge me £10 for the printing process, but two days after I emailed them I received a new pass in the post at no charge. :DI do have an other question though which I'm sure someone on here can answer:I'm planning on visiting The London Dungeons tomorrow but I heard that you can skip the rather large entrance queue if you have a Merlin Annual Pass. Is this true? Thanks. :wub:

  6. She was too busy preparing to release her 500th single.

    and recording her seventh album in seven years! :blink:I agree though. I wish people stopped complaining about this ride and how they are opening it. At the end of the day, this is the first time I can recall a new UK ride getting a 'special' opening ceremony, even if it may just be a few actors and an obscure band. It's a great effort by Thorpe in my opinion and I can't wait to attend on the 15th! :D
  7. If the opening day for Saw is anything to go by I am almost certain the queue will go beyond 2 hours, I remember befor Saw's opening day everyone on these fourms said the line should not be any longer then an hour yet it went up to about 3 hours or something ridiculous and that was befor it started to break down and close. If you want my advice id say get there early as I am almost certain you will have to wait at least two hours to get a ride on opening day.

    I could be wrong, but wasn't Saw's opening day on a Saturday? Wednesday was the celeb/press preview, Thursday was the enthusiast day, Friday was the AP day and Saturday was the official opening day. That's why Swarm should hopefully have a relatively short queue, opening in the middle of the week as supposed to a weekend.
  8. It won't get even a 2 hour queue on opening day. I say that because as long as it opens on time and has both trains going, I'd say a maximum of an hour wait.. if that.

    Good good. ;) I did think that a queue over 2 hours on opening day might be just be a tad too long. Let's just hope there will be no major technical glitches on the day, but the fact that it's B&M gives me a great deal of confidence.
  9. I think the ride itself is great, but its location and theming really lets the whole thing down in all honesty. If it was located on the new land fill next to the dome, with an enclosed station and some sort of theming at the top of the lift hill the ride would have been substantially better. But alas, it had a very tight budget and is rumoured only to be a temporary attraction until the whole area, along with X and the arena is revamped....

  10. Hi guys, Any ideas of how busy it will be on the 19th of march, With it being opening week and with swarm being a big crowd puller will it be very busy, It is a school day though so this could make it that bit quieter.. maybe, many thanks

    I can't imagine it would be that busy in all honesty. Swarm will have been open for 4 days already, including a no doubt busy weekend like you said - you're probably looking at 30-40 minutes max for Swarm I would reckon. :(
×
×
  • Create New...