Jump to content

Chessington General Discussion


Ash

Recommended Posts

But its not even that the park hasn't got high capacity attractions. Both Tomb and Vampire should get through a much higher throughput like they did in the past. Its the way things are run and excessive health and safety protocols that lead to the long waits and prevent them running as they should, eating through the queues much faster

Link to comment
Share on other sites

This isn't Europa though this is Merlin. The day we see the revoke of fastrack is the day Chessington becomes the Uk's no.1 again (it just don't happen I'm afraid).

Chessington could have new/replaced rides by doing the following

1/ new large coaster on Toadies/Peeking site

2/ new dark ride on Tomb's site (watered rumours have appeared pending how wellWC16 goes)

3/ new coaster/dark ride on Temple/Lorikeets area

4/ Chiapas style flume to replace falls

5/ Sky ways to be rebuilt (would be worth it)

Then re-enhance Bubbles, give sea storm the Columbus dinghy treatment and another stage for more entertainment.

Vampire is the concerning one as though it's (technically) the park's most popular ride, at 25 years it's now coming towards the end of its life (25 being the general expectancy of these suspended rides) and even though trains snd hardware was replaced 13/14 years ago, it cant have a long left and when it does fail beyond repair, there's the sticky issue with planning as something similar to the ride could not be built there.

It's a shame Chessington cant invest the level of dedication they in to hotels in to the main park as then we wouldn't have a lot to complain about. The food outlets are slowly improving, fish & chips was a start and chicken shack should help too (no doubt Pizza Pasta & Chicken Co. Will be next).

1: Toadies yeah, but I don't think a large coaster could fit on the PH site.

 

2: I think it might be a little redundant specially with not much throughput increase.

 

3. Yeah I agree.

 

4: I think dragon falls should stay, just with a spruce up and a retheme.

 

5: To be honest Is SS is really 100 percent relevant, specially with Zufari.

 

Personally I think the park should just have a spruce up,

with the new coasters  focusing on being family friendly and high throughput.

Link to comment
Share on other sites

 

So does anyone know why tomb blaster and rattlesnake have been closed for at least the last month or so, and if they are going to reopen?

 

and safari skyway. :D

that's been closed for a while too now.

rattlesnake- because of the smiler

safari skyway- no idea, but it was shut a lot last year towards the end of the season too (and shut for the remainder actually!). I don't remember them opening that even for the halloween event

toom blaster- it's unnatural for that ride to be closed. terror toom/ 5th dimention used to be shut a lot (I remember that). either toom blaster is closed because it's waiting for a part (vampire at the start of the season), the staff are fixing some of the broken targets, or, it's closed because they are retheming it to the halloween atraction (I know that has something to do with a forbidden toomb) and toom blaster seems a good place to do it

though if the latter, they are keeping it a big secret. when hocus pocus hall was closed, they said on the site- this ride is closed because we're refurbishing it to the mystery of hocus pocus hall. the same can be said for vampire and the start of the season. they actually said, vampire's closed.. we're waiting for a part. I think toomb blaster has gone seriously wrong

Link to comment
Share on other sites

Safari Skyway should be shut for the rest of the season yet again (good to see they've kept the tradition going). Tomb Blaster on the other hand is just busy proving to everyone why it needs to be replaced. I'm sure that given the current circumstances they'll be desperately trying to rectify the issue, maybe even get it open for Halloween. But who knows, maybe we'll be lucky enough to have two rides SBNO this season! Yay.

 

 

Rattlesnake is as others have said, closed due to The Smiler incident. We might actually have a hope of that reopening.

Link to comment
Share on other sites

But rattlesnake did reopen after the smiler for a week or two then closed again and whenever I go its testing around 3pm and in the station it seems as if there are new traction wheels, safari skyway really just needs to be removed, even when it was running this year it was on such reduced capacity... And tomb blaster is either broke, or it could be getting a retheme or the closure could be related to the sort of Egyptian howloween thing that I've forgot the name of....

Link to comment
Share on other sites

I just for some reason have a feeling they are designing a new ride system, similar to what happened with slammer... But what makes this even worse, is that because of these closed rides everyone is allowed to go back for free which is good, but just makes the park a lot busier and without some of these rides, cos lets be fair tomb and rattle are pretty big and cwoa and safari is up there, so some rides are ridiculously long... As well as this is there something up with bubbleworks because it always seems to have a 2 hour queue minimum when I have been in the latter half of this year so far, when only two of the four rows of the cattle pen are filled?

Link to comment
Share on other sites

The thing with management at Merlin, they put a positive spin on everything and think they have the right to operate so shi#ty. They overlook, and have been over looking this park for years, and it almost feels that it's finally at breaking point. The hilarity on Trip Advisor, Facebook and here, should be enough to start SERIOUS work on pulling it together. It's utterly embarrassing to see what it once was, and what it has become, and I wish that Merlin would see past the gate numbers, and really understand what a dive of a park it has become.

Link to comment
Share on other sites

It's also ironic that Chessington is the only park they own the freehold of, you'd think that as they owned the place outright, they'd put the effort in, or perhaps that is the issue, no freeholder dictating maintance / upkeep terms to them, so they just ignore it.

Yes Josh that is what happened, it was a few days after Smiler that Rattlesnake and Fury closed for the now infamous 'new safety protocols' to the implemented. Personally I think because Rattlesnake is so old (I first rode that when it was at Littlehampton nearly 40 years ago iirc!) and from what I remember riding it, there is no way for them to stop the cars while they're going round, there are brake runs but they're barely long enough to slow the cars let alone stop them (I could be wrong) so I think they looked at it and thought sh*t we got to do something about that, it's probably taken them this long to design a shutdown system and build some evac platforms.

Link to comment
Share on other sites

It's also ironic that Chessington is the only park they own the freehold of, you'd think that as they owned the place outright, they'd put the effort in, or perhaps that is the issue, no freeholder dictating maintance / upkeep terms to them, so they just ignore it.

Yes Josh that is what happened, it was a few days after Smiler that Rattlesnake and Fury closed for the now infamous 'new safety protocols' to the implemented. Personally I think because Rattlesnake is so old (I first rode that when it was at Littlehampton nearly 40 years ago iirc!) and from what I remember riding it, there is no way for them to stop the cars while they're going round, there are brake runs but they're barely long enough to slow the cars let alone stop them (I could be wrong) so I think they looked at it and thought sh*t we got to do something about that, it's probably taken them this long to design a shutdown system and build some evac platforms.

Rattlesnake is not 40 years old! It was brand new when it was installed for the 1998 season. The cars can stop perfectly well on the block brakes however it did have an incident some years ago where a car on one of the block brakes somehow came free and slammed into the back of another stopped car, causing whiplash.

Link to comment
Share on other sites

Are the Lorikeets still SBNO:ohmy:

 

Has there actually been any access to the Lorikeets at all this season?  I love going to see them and buying that nectar stuff - I usually go round several times.

 

As for Rattlesnake - I remember riding it on the year that it opened and it felt quite new - although even back then a bit whiplashy (is that even a word?!)  Great to hear it has reopened - always a fun ride, sometimes painful on those turns!

Link to comment
Share on other sites

Well, after last year's fiasco, there was very strong vibes that the ride would be removed or at least be in for a major update, and well, one year on its still there, offending our eyes and all. Though, seeing a this is now the second time its done its thing and kicked up a fuss, maybe Merlin will actually listen and give the park money that they need.

 

Its ridiculous how many things are wrong with the ride to be honest, and it'll only get worse if they just continue to poorly patch it up here and there.

Link to comment
Share on other sites

  • Mattgwise changed the title to Chessington General Discussion

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...