Here is a summary of what I will do over the next 10 years:2011: I would send Charlie & The Chocolate Factory to Chessington making way for a new dark ride simulear to Bubbleworks and It's A Small World.2012: I would publicise the park around the olympics but I would have to end the Imperial Leather contract and replacing with Coca-Cola or a drinks company.2013: I would get ride of Nemesis sending to Chessington and build a new thrill ride like a Rattlesnake coaster but on a much bigger scale.2014: I would make a new mystical/spooky/magic land having rides simulear to those at Chessington (KOBRA, VAMPIRE, RAMESES REVENGE)2015: I would close the Monorail completly replacing it with a hop on, hop off train service.2016: I would say goodbye to most rides this year, Rumba Rapids, Rita, Duel, Air and The Flume building a new Flume and a Coaster based on a movie like SAW The Ride.2017: I will not change any ride this year but I will build new shops, cafe's, parks and replace all benches, street lights and information boards.2018: I would get ride of Thir13een making way for a new Air Powered Coaster reaching speeds of 120mph and heights of 120ft2019: I would re-theme all rides around the park and get ride of all small childrens rides replacing them with rides like Chairswings, Enteprise and other thrill rides.2020: I will finally build the biggest ride any theme park in the UK has ever seen, I would then stand down with pride after what I hope a succesfull carrerPLEASE RATE MY IDEAS.