Jump to content
View in the app

A better way to browse. Learn more.

Thorpe Park Mania Forums

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Joshua Coupe

Members
  • Joined

  • Last visited

Everything posted by Joshua Coupe

  1. Here is a summary of what I will do over the next 10 years:2011: I would send Charlie & The Chocolate Factory to Chessington making way for a new dark ride simulear to Bubbleworks and It's A Small World.2012: I would publicise the park around the olympics but I would have to end the Imperial Leather contract and replacing with Coca-Cola or a drinks company.2013: I would get ride of Nemesis sending to Chessington and build a new thrill ride like a Rattlesnake coaster but on a much bigger scale.2014: I would make a new mystical/spooky/magic land having rides simulear to those at Chessington (KOBRA, VAMPIRE, RAMESES REVENGE)2015: I would close the Monorail completly replacing it with a hop on, hop off train service.2016: I would say goodbye to most rides this year, Rumba Rapids, Rita, Duel, Air and The Flume building a new Flume and a Coaster based on a movie like SAW The Ride.2017: I will not change any ride this year but I will build new shops, cafe's, parks and replace all benches, street lights and information boards.2018: I would get ride of Thir13een making way for a new Air Powered Coaster reaching speeds of 120mph and heights of 120ft2019: I would re-theme all rides around the park and get ride of all small childrens rides replacing them with rides like Chairswings, Enteprise and other thrill rides.2020: I will finally build the biggest ride any theme park in the UK has ever seen, I would then stand down with pride after what I hope a succesfull carrerPLEASE RATE MY IDEAS.
  2. I would re-buld (theme) Bubbleworks finishing the contract with Imperial Leather, but I would'nt return it to Proffeser Burps. I would have to find a new sponser who can provide what bubbleworks needs to have to be a good ride. I would have to get rid of 50% of the zoo and move Charlie & Chocolate Factory ride from Alton Towers to the park, this is becasue people go to Alton Towers for the thrill rides and I dont think it fits in at Alton Towers. I would add a child park to Pirates Cove basing it around a pirate ships. I would then swap The Zoo with Maxicania and add more rides to Mexicana. I would completly re-theme Dragon Falls maybe extracting from the Mystic East theme into a more jolly theme, I would also spend half the year cleaning down the whole park and installing new benches, and information boards, A few years down the line in 2015 I would have to demolish Wild Aisa and replace it with Wet Wet Wet from Thorpe Park. Then later on during the next three years I would have to think about getting rid of Vampire and Bubbleworks and build a new River Rapids.I hope my ideas are good please comment!!!

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.