Just wanted to say this. For peeps who talk about that engine with the metal support under it, it won't stay like that. It will be placed on the ground, as the plans show, with a part of it still being connected to the wing itself, so that it will create a head and foot chopper for the right side as well.
Why is it always when I make my update on my youtube page, a better picture update comes afterwards. Anyway, nice to see it's going well. Also one thing I noticed is that the foundations of the tower, seem have started production.And these look like parts of the plane to me.
How would they install the beginning of the corksrew, if they complete the inclined loop first. I thought they would leave the left side of the loop clear, then put the beginning section of the corksrew in. Anyway, I don't know anything on coaster construction, so they will have some clever technique with them. Though I am still surprised that more track is arriving. Hopefully the trains will come with the last deliveries.
A person who works at thorpe park, told a friend that there should be a special promotion on the swarm. I forgot which forum it was placed on, but the person who works at thorpe also said that most of the track should've been up by november, as it is. That backs it up.
Can't wait to see the train travel through that zero-g roll. Well, it looks like the curve up to the in-line twist will be done tommorrow, since it's supports are up.
The plane should fit there, but don't forget that the middle portion of the plane is missing, so those supports closer to the ground, should go into that missing part of the plane.
Yeah I know that, I just wanted to know, since from what I see on the plans, it will be partially hollow in the middle, so I say, take the time it took to build the collapsed tower and add around 2 weeks onto the construction time.
From theme park james. Shows the rest of the zero-g supports going up.Also an update today from theme UK.http://themeuk.net/LC12_Thorpe_ParkPG2.htmlLooks like the in-line twist is being prepared. Pic taken from Theme UK update.
I wonder how long it will be till they put up the other supports for the zero-g roll. Last thing I remember, they were still pouring some footers for the rest of the zero-g supports, from what I saw on some pictures.