After trawling through the planning portal again, which is always interesting I find, I came across the original plans for Colossus. Much like with the http://forum.maniahub.com/topic/151-tidal-wave/page-30#entry164771]original Tidal Wave plans, they are quite different. But before I divulge into that further, let's look at how a new coaster came about in the first place...

As is well known, in 1997, the Tussauds Group took over Thorpe. Prior to that, as you'd expect, it was hard for the park to get serious funding for any major development or investment into the park. In the 10 years prior to that, there had only been two 'major' investments - Canada Creek and X:\NWO. Due to the otherwise low investments, and local competition from Chessington and the newly opened Legoland Windsor, guest numbers were declining and the park was not making profits. In fact, the park themselves describe it as a "spiral of decline", and between 1993 and 1998, visitor numbers had dropped from 1.35million to 0.8million; quite a significant drop really!

ThorpeAttendances1999_zps28f9e421.jpg

This shows the number of visitors, in millions. This was made sometime during the 1999 season, so any figures for 1999 and after are predictions / hopes (with a coaster opening in 2001).

TussaudsAttendances1999_zps57963bef.jpg

Thought this might be of interest too. Attendances at the Tussauds parks and Windsor Safari Park on a similar timescale.

The introduction of Pirates 4D and Tidal Wave was aimed to be, if anything, a 'quick fix', to boost visitor numbers in the short term. Pirates had the intriguing tagline of 'the UK's first 4D cinema', and Tidal Wave could pretty much sell itself, so those investments spread over two years would help attract some people to the park. However, more is of course needed, especially as Tussauds aimed to turn the park into a profitable, year-round business. Of course, as it is, Thorpe still isn't a year-round park.

The aim was, just after the turn of the century, to introduce two big, huge new rides. This would, essentially, be the first step in truly turning the park around. Tussauds noted that, following the introduction of Nemesis at Alton Towers, that park turned around, and it was hoped the same could happen with Thorpe. Two rides were applied for in 1999, to open in 2000 and 2001 - what is described as a "45m elevator ride" and a 40m coaster respectively. Both plans were withdrawn following discussions with the council (and, as such, plans for the rides are not available online). Despite the council advising the best location of the coaster - the current location of Colossus - it was said to be difficult to get approval for the coaster. Whilst it was probable they could have gotten approval for the 45m ride, they decided to withdraw that application too to help with the approval of a revised, 30m tall coaster - what we now know to be Colossus. I can't quite figure out where this elevator ride would have gone, but by the sounds of it, the area would have been close to the coaster, and were to be developed soon. So, I'd guess we'd be looking at where the Lost City flat rides are (which makes sense with rumours I've heard of Detonator originally being planned for Lost City).

So, the park didn't just want this new coaster, they needed it. Without it, the park would struggle and continue its spiral of decline quicker than a helter-skelter. It was projected that an additional 200,000 people would visit the park thanks to the new coaster; a quarter of their current visitors. Can you imagine a ride now where the park hoped they'd get almost an extra 500k visitors thanks to it? So, it was a huge risk in one way; if they didn't get the visitors, it was huge amount of money pretty much chucked down the drain.

So, that's enough background I reckon. But, with all that in mind, what sort of ride do you go for? Well, the park's first choice was, interestingly, a LIM coaster (just to be clear, this coaster had a maximum height of 30m. As I mentioned earlier, the plans for a 40m coaster aren't anywhere online, unfortunately). A brief outline of the coaster itself: The actual launch mechanism was to be inside a tunnel, for protection apparently. After the launch, the train would dip down slightly, and then enter a cobra roll, which would be the high point of the ride, and a vertical loop would follow. Some strange, twisty meandering in the air, an airtime hill and another weird twisty bit and the ride ends. It covers almost the exact same area as Colossus I believe, though a bit shifted about of course.

OriginalColossus_zpse1181ace.jpg

A side on view of the coaster.

OriginalColossus2_zpsdb3f32a8.jpg

A view from where, I think, Rush or Quantum is now situated. Looks...interesting.

However, for reasons I can't find, the plans changed, despite approval of this coaster. I'd assume one reason the plans changed to what we now know to be Colossus is to get the world record inversion count. If you're gonna do something big, you may as well do something massive, right? Personally, I think I prefer what we have now. Colossus really was, and always will be, the ride which 'put the park on the map'. Whilst it might now be uncomfortable and not highly rated - especially amongst enthusiasts - it did the job, and still does to this day.

Superimposition1_zpsf92adf41.jpg

Superimposition2_zps3cf72425.jpg

A couple of badly-edited pictures showing the difference of how the coasters would have looked.

As some may know, and as I mentioned to earlier, Colossus was intended to open for 2001. However, due to this change in plan, the project was pushed back a year. Perhaps this was fortunate for the park; 2001 brought instead 3 new attractions, bringing in more guests, and adding to people knowing of the big, brand new coaster coming next year.

So, we now have the coaster we know and 'love' as Colossus applied for and approved. Yet what we have today is still slightly different to what was originally planned! The entrance was is a completely different place to where it is now - though the cobra roll. The queue would start there, go down into the pit (similar to Smiler's entrance in a way I guess), and then meander around in a similar, but shorter, fashion to as it does now. The shop also bordered directly with the station, instead of its current location.

ColossusQueue_zps5b4a653f.jpg

I've - badly - shown the queue layouts; black is ordinary, red is Fastrack (then known as Virtual Q). Interestingly, approx maximum queue times were 40mins and 15mins respectively!

colossus2.jpg

This is a RCT screenshot made by John Wardley, where you can see the entrance through the cobra roll. (Photo taken from Thorpe Park Guide Archives).

I'd guess the changes to the queue line and shop location were more cosmetic more than anything else. Again, I think I prefer what we have now, specifically the pit, than what we could have had.

So that's about it really. If you read through all that ramble, I hope it made sense. I just thought I'd share the wondrous history of Colossus which I've pieced together - from the initial reasons and vision, to design and to what we have got today.

3 Comments


Recommended Comments

I loved reading this Josh! Cheers for posting.

I knew they had a launched coaster planned but I hadn't seen the layout like this.

I'm glad we ended up with Colossus. I wonder what TP would look like today if the launch had been built instead? Certainly Stealth wouldn't have been built.

I'd love to see that admissions graph extended all the way to to this year.

Link to comment

Thanks for this Josh, I find it very interesting of these plans of Colossus and how these plans turned out to be. I'm certainly pleased about the way the ride has turned out after all these plans considered.

Link to comment
Guest
Add a comment...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...