  1. The ride system should have been able to stop the ride. No excuses on how little time the system had. What it does mean is that the ride hosts could have done very little to stop it.
  2. The ride encountered technical difficulties and they sent it round testing. An announcement was made which said they had fixed it.
  3. Not trying to cause an argument but maybe try and show a bit more respect to the 4 people injured. Complaining about your lift walk maybe isn't appropriate. No ride system should ever allow a collision. I hope Gerst get some serious investigating on how this was allowed to happen.
  4. Well then that is a bit more serious than a bolt. I wonder how the ride even let 2 trains on the same block. I hope everyone involved is ok.
  5. Since when did they introduce that? There is nothing on the website about it.
  6. £600 for a VIP pass to be annoyed a British parks of which I really don't like the operators of said parks or I could put that money towards flights for a better park in america or Europe.
  7. I did 6 days in a row at Cedar Point but I couldn't imagine 5 days at Thorpe, especially when sleeping in a shipping container.
  8. The person who walks round with a tablet main job is to make sure fastrack queues don't become too long. Or at least that is what he told our group when we asked.
  9. There is no solution to long queues. The way to solve it is to make queues fun and entertaining so people feel like they are not in a queue. All the money they continue to spend on RnR is a waste. The idea should never have left the room it was created in. Regardless of if it is a trial or not the idea is flawed and the idea should have been killed right after someone worked out the maths of the people behind it.
  10. I wouldn't call it brave I would call it stupidity. What moron trials a system which is notorious for going wrong and not have a back up plan when it does go spectacularly wrong. You would have been very hard pressed to find a person on that day which had an all round positive experience. What's worse is the system was designed for exactly that day. To deal with large numbers and solve the queues and it did the exact opposite. You can blame it on technical faults and poor judgement all you like but at the end of the day it went wrong because the idea is just flawed. They should have let RnR die there before it causes any more damage.
  11. Happens all the time at swarm. Often I go over to it to see it saying 45 minutes when its walk on. Will stay like that for an hour then the person selling fastrack leaves and after that its shortly followed by the queue time saying 10 minutes.
  12. It works out that if everyone is a group of 4 and it assumes 80% of people have a phone are equally distributed then on a day of 15,000 6 groups would have no phone. In reality there would be more than 6 groups as the people with a phone that works with RnR is much lower than 80% but yes it is a very small number.
  13. Its not a case of you need a phone its a case of you need a fairly new smart phone. The website has a load of scripting errors (presumably they will fix that) but it results in anyone with an old phone cant use the system either. The fright night trial should have been perfect for the system. It had effectively 5 extra flat rides and the system was being used where it was designed to be used. It was perfect conditions for RnR and it failed spectacularly. There was not one aspect of the system you could have called successful on those days. It did get good reviews because when using RnR it seemed amazing they only had to wait 1 hour physically and 5 hours virtually compared to the alternative of the 4 hour physical queue. I am sure there would have been many people on park who were unaware that the reason it was a 4 hour physical queue was because of RnR. According to twitter the fastrack queue will be a different queue to the RnR and the Main Queue.
  14. Who honestly believes that Thorpe can create a queue-less park. If you believe that the park could get it so you never wait more than 15 minutes then you seriously need to reconsider your logic. Another thing which is annoying me is how anyone could think this system could work without a physical queue. How on earth can you have 15,000 people divided up across the flat rides. Which if Thorpe do what they originally intended have 15,000 people divided up across just the shops and the odd flat that doesn't have it. RnR will see the park take a massive turn for the worse.
  15. Its a pile of junk and Alton came to their senses to remove it?
  16. I think its pretty safe to say a majority of you know my opinion on the shambles that is RnR, ill try not to bore you with all the details again. I'm just amazed that after 5 hour virtual waits and 2 hour physical queues with the system last time they even considered running it again. It was their most complained about day on social media by far and there was a massive backlog in guest services replying to emails. They are truly mental. I don't want to see the system fail, it already has failed. Every single thing about it is a complete failure as the whole concept doesn't even work. Which was demonstrated last time. The only people who like the system are the ones who abused it by using it first and making the people who didn't use it suffer. Its broken, no matter how much money they spend on it, it will not work. To make things even worse the people with out smart phones which do exist although Thorpe may seem to think otherwise now no longer have a system they can use. Something of which I was assured back when the system first started they would keep.
  17. Project LC

    Slammer

    Is it possible for you to track is uptime so you can find out its reliability as a percentage?
  18. 21 isn't exactly a significant milestone. 20 I can understand or 25 but 21 not so much. Then when you look at their other rides. They have far more years to their name. I doubt that the nemesis21 merchandise makes that much more than it would with out the 21.
  19. Project LC

    Slammer

    I may have to set up a website which sole purpose is to say if slammer is working or not.
  20. Last time I checked it was set for summer 2016. It may have been delayed until 2017 though.
  21. Project LC

    Slammer

    Remember that engineers will have been testing it for some of that time. So it will be less than 12 hours they have had on it.
  22. They wont evac a ride until they know how serious the problem is which often means the engineers will have to turn up first. There are exceptions to that of course, when swarm sheered a bolt they evacuated the queue pretty quickly.
  23. Chains on a lift hill are pretty strong. It would take some serious neglect from the engineers for one to snap, its pretty rare for one to break. Its also unlikely for a ride to be evacuated because someone made a mess. Often they just stop operation for a short while.