2008)Park opening April 25th, after a massive tidy up of themeing and general cleaning.2009)New coaster, new hotel. Island one completed, with Rameses Revenge moved onto it. Lose Zodiac to Chessington. Path going from Stealth jetty, up to the new island. 2010)Removal of Large area of Neptune's Beach, but leave the small section. Uproot Depth charge, with it facing towards the dome. Open that area up with paths. Island two completed, with a path going through between the Fish and Stealth's Maintenance shed, up towards island two, and another bridge connecting Island One and Two. Vortex moved up to Island 2. Colossus Re-Tracking.2011)Again, park opens month late, for cleaning. Island 3 Completed, with Rush moved up. Path going from Island 2 up to it, with a path connecting to the peninsular. In other words, about 100 metres above FF.2012)I predict a....Vekoma! Exactly like James's idea, with Blade from AT, themed as a Pirate Ship. Vekoma Pirate, with no Inversions. Well themed, taking the time out to complete this. Quantum leaves.2013)Replace Samurai, Maybe with another brand new Top Scan, or leaving the area bare. Park opens month late. You know the drill :)2014)Remove Tidal, and replace with an Aquatrax. Remove all the buildings around KFC, up to Detonator area, to help fit. 2015) Detonator removed, and replace with two together, which has higher capacity.2016)Bollinger and Mabillard Mega Coaster, to fit around the whole park, like teh new 'Hollywood:The Ride' in Japan. Station where Neptunes Beach used to be.2017)Drain whole leake, into other subsidary lakes. I know this wouldn;t happen, but it would help.