Jump to content

Fred

Members
  • Posts

    3181
  • Joined

  • Last visited

Posts posted by Fred

  1. Oh *****sake, I was gonna be well cool and wicked and pretend this is the "say nice ***** about the person above you".. but its frankie who last posted.. again. GAR. Spoil my fun.

  2. Kings cross is being redone and will have a huge glass thingy as its main forecourt. Its gonna look *****ing brilliant. I love ECML as I travelled on it often to go to Newcastle. Not travelled on it much since GNER became NXEC though, for some reason might be to do with nostalgia :angry:

  3. oo0ooooo00 someone else with a Skoda! What one do you have? Skoda Fabia to the maxxx :angry:

    Sorry didn't notice this earlier. I have a Fabia 1.4l. They are brilliant :angry:Alex is very cool..
  4. Go southern - Only times I've been held up is because some tit killed themselves at thornton heath, and a *****off huge fire outside london bridge.

  5. The engineers who are liable for stuff like this. If they sign off paperwork and not actually check it and something happens, they're liable. Vampire takes so long every single morning to be signed over because they have to physically check every part of the train, which includes every bolt including the 4 holding each wheel together, and ride before handing it over to rides staff. It'll be the same anywhere in tussauds/merlin parks as thats the standard they do.

  6. To be honest I doubt it will be all that long.They will want it back sooner than a month I would think.Its not even certain they require a new part, no one knows at this point.

    Fury was said to be shut for a month, it reopened within a week :(. Its just covering themselves for delivery of the part.
  7. AND , we got a better canteen than you <_<

    Well, if you class a small place with no windows as better :P.Money isn't everything though, its how much you find your job safe, and how much you enjoy it.. I currently love both of my two jobs :P
  8. As the babycoaster won't cost alot, not nearly as much as an actual thrill coaster.

    Yus, cos steel and labour costs are more than halved when theres less Gs involved.Do us all a favour and dont talk unless you know what you're actually on about.
×
×
  • Create New...