Jump to content

Project LC

Members
  • Posts

    1907
  • Joined

  • Last visited

  • Days Won

    7

Everything posted by Project LC

  1. Oh its just that, that line confused me.
  2. Wait a second which one is swing A, I thought A was the swing closest to the operator room which is obviously performing better. The one closest the operator room gets to full height unlike the other swing which most of the time doesn't reach 90.
  3. That small piece of fabric does not act as a fail safe it is there so if a evac is required and the seats are released they do not all release at once. On B&M and intamin multiple rows get unlocked at the same time and so the belts are there to hold them so 1 row at a time is removed. Gertslauer have individually unlocking seats so they do not need seat belts. As for hydraulic seats are considered safe that is true but that doesn't explain why The Swarm has seat belts. The only purpose for belts is in the event of an evac, the ratchet system can not slip otherwise there is no way they would be allowed to have them. You can believe what you want but I am telling you they are there for evac only.
  4. Buckling the ride is really not important. The ride operation doesn't need the seat belts, they are just there so if they need to get people off not in the station all the seats don't release at the same time. The ride wont leave unless all the seats are locked and it only takes 5 seconds to type in 2 numbers.
  5. yes they pick a number at random and type it in as the queue time.
  6. One problem with the system they use is that if it is based of wait time then they over allocate tickets as the estimated queue times are always too short. Not sure if they over estimate on purpose to encourage sales or its that every ride they work it out wrong.
  7. Does anyone know the actual percentage of the throughput of a ride which goes towards the main queue. More and more I visit the more and more I fastracks I think they sell. I would like to think that they only allocate a maximum of 10% to fastracks but something tells me its a lot more.
  8. Bhasvic finished early yesterday and all the A2 students are off as they either have a few exams left or completly done. Also the weather is/was nice.
  9. I'm still very confused in how a shark made of junk relates to thorpe park. If its soley themed like that becuase of an island like no other then I'm slightly concerned. An island like no other is ok but could be so much more and so much less generic.
  10. Often they let the annual pass people in later than expected. Its meant to be 9:15 at weekends but rarely is. Weekends and holidays are when they open at 9:30, 10 is the rest of the time with a few exceptions of when they know it will be busy like school strikes and things like that.
  11. Being let in early isnt that beneficial. All of the crash pad guests are already in there and the normal people get let in about 5 minutes after.
  12. Yeah a lack of water. If there is no water getting to the park I would assume that means there is a lack of water.
  13. Cedar point has been closed for the last 2 days because of a lack of water. Any other theme parks done this before or is this another cedar point world record.
  14. I am still yet to understand what the big attraction about hybrids are. If your having a wood coaster act as steel then just make it out of steel and avoid the creation of this ugly mess.
  15. Thorpe would not get a Doctor Who themed ride. I doubt any merlin park would as that is the BBC's flagship. If you messed it up in the smallest detail then both BBC and merlin would come off looking bad. Personally I dont think its a risk that they are willing to take.
  16. Project LC

    Nemesis

    They drain it when it rains. Too much water gets in the system and the water level rises. That means it flows into the surroundings and can prevent Nemesis from running as the clearance of the train and the water isn't big enough.
  17. If the first way didnt work and yesterdays way didnt work what are they going to try next. Personally I think they should stick with yesterdays system and refine the ratios of the queues. If the fastrack system is rolled into the RnR then it should work better as its only split 2 ways and the RnR can factor in the amount of fastrack exactly.
  18. Excessive hang time is very excessive. From the pov the ride doesnt really flow into the next element too well.
  19. I'm just hoping that its not really successful and is introduced to the smiler.
  20. The cars seem quite light and the voltage being used is quite high. So when the cars get bumped and move upwards instead of the current stopping it just jumps. I do believe that, that generates more heat and is leading to the new rubber burning. It should stop after the ride has settled in.
  21. well they need to base it on the real queue and that is really hard to work out when the real queue is influenced by the reserve and ride queue. I guess what they have done it allocate a certain throughput to RnR and another set to the real queue. so if that amount of people don't turn up or the throughput changes then it will go wrong. On another note its spreading! They have a paper based system developing at cbeebies land.
  22. or 1 person to scan your ticket where the fastrack people merge.
  23. if the real queue is only 30 minutes then it sounds like it isn't really being tested as its meant to reduce queues on very busy days.. The problems will arise when the queues should be 90 minutes long. That is when we will see if this system actually works. However at the moment it does seem to be a working system which can eventually lead to people loosing their jobs as fastracks can be sold online. I'm quite sure that is the true aim. Cut jobs and on the system have a big fastrack sign to encourage sales.
  24. Does it normally stall there?
  25. So it stalled on the overbank turn? That is an odd place to stall.
×
×
  • Create New...