Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 09/27/23 in Posts

  1. God he's good. Must be why he's a mod. Waff zooooooom splosh splish splash I was takin a bath rub a dub dub things are lookng UP. I'm desperate, so where can I.P. We need more time, lord.
    3 points
  2. I predict that construction for Project Exodus will go vertical on Monday 9th October. I reckon the first supports will go in sometime between 11am and 1pm that day.
    2 points
  3. MattyMoo

    Colossus

    Blimey, 2024 promises to be big - what with this and another single section of track going to be replaced 🔥
    1 point
  4. JoshC.

    Colossus

    Colour me pessimistic but until said upgrade happens, I won't believe it till it happens. That said, it's a good and necessary thing to be investigating and will definitely help. It's ultimately a cheap thing to do too, so whilst something like new trains would be better, this does the job for now.
    1 point
  5. Benin

    Colossus

    Just get new trains and solve the problems in one go.
    1 point
  6. Matt N

    Colossus

    In some interesting news, Scott from Your Experience Guide was told on a lift hill climb that Colossus is getting a technical upgrade for 2024 that will result in restraints being able to be released individually. This will mean that when a rider doesn't fit or needs their restraint adjusting, their restraint can be released on its own as opposed to the current situation where every restraint on the train needs releasing and rechecking. This should really help to improve throughputs on Colossus, as by my observation, the constant need to release and recheck all restraints due to guests not fitting or restraints needing to be adjusted is one of the biggest bottlenecks that's hamstringing the ride's throughput at present. Source: (Go to 2:55 if the timestamp doesn't work)
    1 point
×
×
  • Create New...