Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 01/11/24 in all areas

  1. Trims on the exit to the non-inverting Immelmann (the element prior to the outerbank dive): hopefully one of those 'just in case' trims, like the one at the bottom of Swarm's drop, but we shall see
    3 points
  2. Theme Park Guide's latest Hyperia Construction Update article (07/01/2024) has just been published (link below). A brief summary to follow; - More track and supports have been installed on the lower sections of the ride, with work continuing on the support structures for the Immelmann / Stall Dive. - Theming has started inside the station, with doors installed on the station and maintenance shed. - There are currently two large items being protected from the elements outside the maintenance shed. Unsure as to what these are at the moment. https://themeparkguide.co.uk/news-page/7th-January-2024-Hyperia-Construction-Work-Resumes
    1 point
  3. Lots going on today!
    1 point
×
×
  • Create New...