Jump to content
View in the app

A better way to browse. Learn more.

Thorpe Park Mania Forums

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Benin

Members
  • Joined

  • Last visited

Everything posted by Benin

  1. Single riders should be batched at loading area. Especially if going in before the bays as it fulfils the point of the queue in the first place. Method like Smiler could work as long as they had actually stopped people from just sneaking up the normal queue after bag drop.
  2. Single rider usually is for single spaces. You might get lucky with 2s but not too often. It's very dependent on the implementation and location of the batching point though.
  3. I dunno, Blackpool do sell old ride parts.
  4. Throughput means it doesn't need one. Even on opening day the queue had gone to standard levels.
  5. Same every year for all the parks to be fair. Never seem completely ready. And always hope its different but never seems to be.
  6. The pre-show makes me think someone went to Movie Park Germany and liked the Van Helsing queue. I'm not sure what you really expected regarding a lot of the older props/ghosts. Few would make sense in terms of the new storyline (everyone has vanished, but the undertaker is still there for example) and in terms of budget I think they were essentially stuck reusing a lot of Duel mechanisms which were always cheap and somewhat off-putting. Based off POV viewing, there's a definite air of not quite completeness about it. 2 sections in complete darkness certainly doesn't make sense to me considering it's quite filled in everywhere else. Presumably timescales and priorities as with all projects. I'd imagine they'll tweak and edit things as they go. Much like the original Haunted House. From an initial standpoint though it looks a vast improvement over what Duel had turned into, and shows the difference 30 years makes.
  7. Easter Weekend in France if anyone fancies.
  8. I doubt they'd be allowed to open the park if half of it was a construction site. This isn't continental Europe!
  9. I don't really have an opinion on it. It's at least thematic to the ride but no one really pays attention to the names of shops. Towers have done their traditional spoilerific news story with ITV. Available via https://www.itv.com/news/central/2023-03-17/inside-alton-towers-newest-ride-the-curse-at-alton-manor
  10. Park map says its changed.
  11. Find out tomorrow. Presumably the duck rumour like with half of this ride will be a "wink wink" reference to a previous ride. Sure there'll be a full POV by half the vloggers by closing time.
  12. BPB have announced "Technical Rehearsals" will be taking place for Valhalla in April. Completely forgot this still hadn't reopened.
  13. It depends what happens regarding the Trommel scene. Likelihood is that the giant spider set piece will remain but different lighting/effects/etc. Probably a new recording of the "ARE YOU SCARED OF SPIDERS?" phrase added on. Based on the advert looks like the ghost corridor is getting a retheme, maybe old Bill to be replaced and additional effects added (or maybe they'll revisit the original concept for it). Beyond that in terms of big scenes just leaves the garden. Depends if it makes sense within the storyline and where things are placed sequentially. Personally I would've gutted the whole thing and started afresh.
  14. Based upon the level of references seen so far its very unlikely that the music won't contain half of the old scores of HH and Duel. Probably contain music from other parts of the park at the rate they're going. (Yes I don't think the number of references to past and present Towers is a great thing. The sheer amount is kind of taking it too far for me and could potentially for many detract from the ride. Then again probably part of the marketing in the PR shots, but does concern me that the ride will have way too many nudges and winks to goons.)
  15. TV ad. Seems to confirm 5 seats and spiders (urgh).
  16. https://www.expressandstar.com/news/local-hubs/birmingham/2023/03/13/new-attraction-set-to-take-people-on-haunting-ride/ If you want to go in clean as it were, best batten down the social media hatches. The 'subtle' Easter eggs will be prevalent though.
  17. Love people who say "I can't say anything" then proceed to blab out stuff.
  18. Think a lot of their building practices is for budgetary/funding reasons or perhaps an elaborate money laundering scheme? More of those that involve RMCs please!
  19. They'd have been making that animatronic for longer than 6 months. The park would've known about the development for around a year or so. Projects don't start when the previous ride closes. I'd imagine this would've been a refurbishment that snowballed into a full new attraction due to the way in which Merlin tend to operate. A standard maintenance budget? Not unless we can market it as new! Ghost Train redo is down to the loss of the IP. So different situation.
  20. This could be an interesting discussion if presented in text form over a YouTube video. End of the day it's dependent on what you want from a roller coaster. Tends to be that European parks have to work with far more limitations so tend to think outside the box comparatively. Most American parks are very plonked. So are some European parks. But at the same time there are some great and iconic coasters in both regions.
  21. The theme/IP might not scream Wild West, but at least the building will fit in.
  22. "The rumours are true!" No actually substantial reasoning beyond the things being cleaned as well as the trough. Goes from "hopefully ready for testing" to "THEYRE COMING BACK!!1111". Don't really care if they're on or off but I mean people jumping to absolute conclusions is just weird to me.
  23. A kids game at that. Clearly quite popular as there's different versions and shelves of it in toy shops and some gaming ones too.
  24. Yeah but the Enterprise Memorial Picnic Area will truly be world class.

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.