Jump to content

dragon2000

Members
  • Posts

    249
  • Joined

  • Last visited

Everything posted by dragon2000

  1. In the clip 'in the busy summer, queues can get up to 45 minutes'. How those have changed along with the prices. Hello 120 minutes for Fury and Vampire.
  2. It sounded like he wasn't really happy with the project. Sounds like Merlin wanted to have VR tech in this attraction but the tech severely limited the creative freedom that the digital content company wanted. I think he is right, it is going to be a few years until VR reaches an 'optimum'. Another rush to have a 'worlds first'?
  3. Same thing happened about 30mins before closing on Wednesday. Reoccurring problem?
  4. Yeah, another bad day. Animals were the best part of the day. Pretty much gave up with rides after the first hour. Waited 50mins for Vampire after getting in the queue at 10.05...
  5. So, 'working hard' is the ride still sitting there with nothing being done to it. Yes, maybe they are waiting for parts etc. But then when Dragon Falls, Fury, Griffons Galleon, Scorpion Express, Ratllesnake are all broken/breaking down on the same day, which do you choose to fix first...?
  6. Good question, just passing on what I heard from a member of staff.
  7. I think I posted earlier in this topic but rumour is that Samurai is currently working but Merlin are not letting the park open it yet.
  8. If anyone has not watched the tour video that Zach posted above, you must. The land looks fantastic. Will be even better walking through it in person with the dinos and rides in operation.
  9. And a final construction blog update here: https://paultonspark.co.uk/lost-kingdom/2016/04/5667/lost-kingdom-construction-update-april-2016 Shows off Velociraptor entrance, Flight of the Pterosaur theming, completed Dinosaur Encounter fencing, and completed play park. On park today, I believe all the rides in the area were testing and final cleaning taking place. Not long until press and preview days.
  10. The problem is, this has been the situation for years. It's not a one off. The park should be able to get two trains on each coaster for the start of each season and each day if needed. If you're having issues year after year, something needs to change.
  11. At the moment the train carriage itself is wrapped in tarpaulin. The next steps will require moving and working more closely with the carriage and so the tarpaulins will be draped over the scaffolding instead. For weather protection and secrecy. You can see how the scaffolding is angled so rain runs off.
  12. Hallelujah! Second to last day of the Easter holidays but at last... The pessimist in me says that it will be back on one train again from Monday though, seeing as schools are back.
  13. The animatronic dinosaurs were testing today - movement and sound. Looking very impressive. Testing is also continuing on Velociraptor. The tunnel on Flight of the Pterosaur has now been fully built and the painting finished. Hopefully the scaffolding will be down soon and final testing resume. It's all very exciting!
  14. Chessington today... so bad. I need some time to reflect before a fuller post.
  15. It definitely seems more wild this year. Guessing more or bigger pipes along the trough too.
  16. Well, would be nice if it could make an a appearance during busy times!
  17. Don't think so. Couldn't even see the second train in the maintenance shed yesterday.
  18. Such a bad day of operations for the park today: Colossus on one train all day. Inferno on one train for hours. Stealth opening an hour+ late, Colossus several hours late, Detonator late. Saw on 6 cars? X on 2? (60min queue!) No queue time boards working on the rides for several hours at start of day. No 'main' multiple queue time boards working all day. Breakdowns on Vortex, Slammer, Inferno. Samurai closed all day. So many exit riders. 2 cars closed off for main queue in Colossus most of day because of it. Not cool when when a train is getting dispatched every 5 minutes on one train... So painful. And what's with the ever growing annual pass entry queue but only having one staff member and a single dodgy turnstile scanning passes!? Loyal pass holders get into the park so much more slowly than day ticket holders.
  19. Long breakdown this afternoon with a full queue evac but eventually reopened. Also fed up with it opening on one train for hours before going onto two.
  20. Was told today that Samurai is functioning but Merlin have not given permission for the park to run the ride. No idea why...
  21. Thanks Matt - do you know if the dispatch announcement/jingle clash has been sorted?
  22. dragon2000

    Wicker Man

    Chiapas style ride and Intamin woodie along the lines of El Toro please...
  23. Yep, typically find it gets better during the year as parts break in. As well as later in the day. Summer nights and Fright Nights last year it was absolutely flying!
  24. One of the turntables on the Teacups was broken on Sunday. Wouldn't you expect it to be working after the winter's strip down and re-build!?
  25. The assumption is that Samurai is open from Thursday then? Place your bets for how long it lives for now...
×
×
  • Create New...