Jump to content

Project LC

Members
  • Posts

    1917
  • Joined

  • Last visited

  • Days Won

    7

Everything posted by Project LC

  1. It doesn't matter how good the ride is. It's using actors so in a few years time it will be an incomplete experience. Merlin are incapable of learning as they have proven time and time again. I hope simworxs have an amazing ride system as that is the only thing that will keep this attraction around for more than 5 years.
  2. Anyone know the reason why they have turned it back round? I'm assuming it's cheaper somehow.
  3. Project LC

    Wicker Man

    Intamin Multilaunch which was originally designed as an aquatrax.
  4. Project LC

    Wicker Man

    I take it this means we are not getting the woodie any time soon.
  5. Well this is not exactly a new thing. If it was a one off then I'm sure we would all understand. However this keeps happening. Multiple rides not being ready for the start of the season. The chance of 4+ rides having a last minute fault year on year is incredibly low. Besides most parks scheduling accounts for delays like you mentioned. Something clearly isn't as good on the maintenance side as it is at other parks. Could be bad management, lack of staff, ageing neglected rides, the list goes on.
  6. For the budget they had I do not care if they use tarmac. For the budget DBGT has that floor is just a joke.
  7. I would have said 2020 when it is no longer viable to continue use of Galactica in the way they intend to use it this year. Its a gimmick that will quickly show its age. The animation looks of very poor quality and the technology is going to age incredibly fast. Will cost a lot to run and a lot to maintain.
  8. I was referring to when 2 stations are in use. If one station is delayed the other one doesn't need to go as fast as the time before they can dispatch is longer. Think of it as a train has to leave within a time from the previous train leaving. Not the time from when the train arrived back in the station. While the overall time is the same the individual time is not. So to achieve a good throughput all you have to do is a really fast first train and a good time for trains 2 and 3.
  9. Air actually has an issue of dispatching too soon (according to ride ops ive spoken to). Over the course of the day the stations become out of sync because one station is normally too fast (could also be seen as one was delayed). I'm sure you have all been on it where it slows down on the lift hill or even stops. Cleaning each headset will clearly reduce the throughput but out of all the rides to choose from they chose the best one. Its not hard to get an air train ready to dispatch in time during normal operation so hopefully on a good day the throughput wont be effected too much.
  10. It's way better than any restaurant Merlin has to offer. Volcano bay is a water park. Capacity isn't exactly a necessity. Finally by no means is kong cheap. The rock work distracts you from the Forrest anyway.
  11. Well you won't be pleased to hear Derren Brown's ghost train is using the chucklevision theme.
  12. The paint on the rails has lasted far longer than the smiler. That paint was gone after half a day.
  13. The original plan was that if a train had a problem the 3rd train could be used so 2 train operation was always possible. However when Merlin took over this was no longer the case and they made it so one was always in strip down while the other 2 were useable so over the winter they wouldn't have to strip 3 trains.
  14. They won't have 3 trains built up. One is always in strip down to ease the maintenance load on the engineers.
  15. Project LC

    Rita

    Honestly I would prefer no Rita but that is not my point. Health and safety have not said you need scaffolding under the walk way on the basis that H&S do not care how you fix the issue just as long as its fixed in a safe way. Scaffolding will have been the cheapest solution, not the best.
  16. Project LC

    Rita

    I seem to have made my mind up on Ritas work too quickly. Now I have found out they didn't even remove the scaffolding, they have just tried and cover it up, my opinion of the work has gone even lower. All they would have needed was a little bit more money and they could have had a nice looking solution. Instead we have a wooden fence with some vines and some tacky signs on it. However what makes me even more annoyed is that people seem to be happy and content with it.
  17. They have a nice looking run down warehouse which looks far better than what I thought it would and then the floor in front of it looks a complete mess.
  18. The 360 animation will have cost a lot. All animation costs a lot because of the amount of work that goes into it.
  19. Project LC

    Rita

    Just as expected. It still looks dreadful.
  20. No coaster builder. Just the modular building for the generic and pirate set. Along with paths and possibly some flat rides. They aim to update it often so the alpha will keep getting better until it's release (Some time September-December).
  21. The detail going into the flat rides is very impressive. The screamin' swing is just wonderful. Also the hints at how RCTW's screamin' swing is terrible compared to there's I found amusing.
  22. I would be surprised if there is not a limit on what days you can choose to go on.
  23. Project LC

    Rita

    While a vast improvement on what was there before it still looks horrible in every single way.
  24. The are likely to be very similar to Elite: Dangerous requirements. Its running on the same engine. They are going to use the alpha to find out what the minimum requirements are for the game so at the time being they don't have that kind of data. Apparently it scales well but at the moment we haven't seen any game footage so how it runs could be anyone's guess. So far its all been pre-rendered.
  25. I have gone and bought the early bird edition so I can have access to the Alpha where I will be doing videos on it. While it was very expensive all I can currently think about is this game so I feel I will get my use out of it. The fact that on release this will have up to 20,000 people in a park is incredible. The alpha has about 40 rides and coasters at the moment in time with more to come. Also the developers talking about having dark rides there is very little this game doesn't have.
×
×
  • Create New...