2009: - Hotel Building Starts2010: - Colossus repaint - The Bump At the bottom of the drop on Saw the ride is fixed. - Hotel Building Continues. - Everything in the pyramid for X no way out is removed including the track put the main building is Kept.2011: - Hotel Is Finished - Colossus Trains Are Sent away for new spacious restraints + the bars on the side of the train are put back on. - A Gerstlauer spinning coaster is added in the x no way out pyramid, themed around a secret high-tech military Camp hidden in an ancient pyramid ruins. The Red/Orange parts of the pyramid will be painted gold so the pyramid will be gold and blue. the track will be painted Yellow with purple supports, only half the ride will be dark but the rest will be in a lit area in the pyramid soaring over the public, whom will be able to explore interactive scenery, the pyramid/ area will be named Secret Plan and the name of the coaster would be. Code: Red.2012: - A New area on the land behind stealth will be opened, it will be accessible by a path through sunken gardens. The area's name is Rock N Roll City. - A Maurer Sohne X-car Music coaster will be opened in the new area, the coaster will be called, Elvis's New Groove. It will be 110ft high with a 87 degree drop and will include 3 inversions: The Double take inversion, a corkscrew and a dive loop.2013: - A Zamperla Super spin ride is added on the new land rock N roll city, Named Whackey Guitar. - A Mac donalds is added on Rock N roll city. 2014: - Genral Clean UpsCan't be bothered to do anymore lol