Jump to content

Benin

Members
  • Posts

    9370
  • Joined

  • Last visited

  • Days Won

    159

Everything posted by Benin

  1. T'Ultimate is probably one of the roughest coasters in the country... It's also one of the most (strangely) enjoyable though... But it is as said, a marmite coaster, just go for it with open expectations... Raptor Attack is pretty good as well considering it's an indoor Pinfari...
  2. If it's quiet I'll have done everything I want to by 11 tbh... Bit random though it's opening earlier than anticipated... Maybe the uptake hasn't been as good for the days, hence saving money on needless levels of staffing?
  3. That bottom 10 is <3 Though I'd have thought Caligostro would be in there over Bobbahn...
  4. http://elblogdedream.com/2014/03/03/angkor-visitamos-las-obras-en-portaventura/ The theming on this is (like most of PA) top class... Why don't we get this sort of stuff?
  5. Benin

    Submission

    Let's not forget Towers also has a few dark rides which are good throughput machines (particularly Duel and Hex), which to a degree can make up for the lack of flats... Also, Twirling Toadstool exists, and the Teacups, and Heave Ho... Which takes the flat ride offering to 6, which isn't that bad... Could do with something back in Dark Forest mind, and they'll probably replace Submission next year (we hope) with something... But it's hard to judge whether Merlin would actually go for a flat ride because of their obsessive USP ideals...
  6. The simplest thing would be to replace the stonework tbh, I'd say that would be easier than erecting a fence...
  7. What rides at Towers haven't actually opened when they were meant to aside from Smiler? Cos, Thirteen did (by the skin of its teeth granted, but it was still open), as did Sub Terra (whatever people say, I enjoyed the original version of it, though I missed out on the apparent nothing was working day) and Ice Age... Same question extends to Chessie as well, though that of course only extends to Zufari as the only ride they have built in the same time frame we are looking at...
  8. Aside from the fact he was asking how long would it take to build, you clearly quoted the wrong thing completely, as it was related to the Air Race construction... And if Drayton could afford an Intamin, they can afford a Mack...
  9. I dunno, it drips so much we DO have the waterfalls over the side
  10. Bit needless no? This won't take long to build at all, assuming it's gonna be extremely basic and simple... Probs a month or two if that? That's for everything mind, the ride system itself will probably take a month tops... It'll still open in June though... Cos Drayton... Do they still open rides with a C-List band?
  11. Benin

    Pricing

    Ricky's covered it, but I await your reply as my point has been explained (did it really need explaining? I mean it was pretty clear that it was in reference to having someone who was in the concession price-range had a distinct desire to ride everything until she was prevented to for medical reasons, oh well)...
  12. I think we're still waiting for the quality aspect of Storm Surge...
  13. That pic actually shows WHY it's been fenced off, the state of the steps there are in no fit purpose for anyone to use that walkway because of the height difference between it and the path... That of course doesn't mean the fence is ugly as sin... Are Towers allowed to touch up things like this I wonder? Or is it just a case of a dire fence being cheaper than replacing the stonework?
  14. Benin

    Samurai

    Same amount of time Chessie has been drowning in a pit of despari and non-investment... If not slightly longer...
  15. Benin

    Pricing

    My Nan used to go on the rides until the doctors forbade her from doing so... As Marc said, it's a difficult one to implement unless you bring in a wristband system, then things just get burdenous...
  16. Benin

    Samurai

    I would say the restraint wobble is an age thing tbh, 15 years is a long time for ride advancement or improvement... Mondial probably looked to create a fully locked restraint when they realised this issue... Doesn't effect me mind, as it's clearly safe and has been for longer than the lives of some on this forum...
  17. Problem lies with the ability to invest, remember a year or two back when Lightwater couldn't even construct a Tractor Ride, so had to wait a year to do so? Slippery slope of life, the smaller parks can't afford to build anything decent, no one visits... Although of course now there are plenty of rides available on the cheap, you have to wonder if these park's budgets even stretch that far...
  18. Budget gets given to others that are deemed as 'unsuccessful'... It's the way Merlin have decided that all parks give to the one big pot so it can be distributed 'accordingly', and so parks that do well in their own right (Chessington/Towers) can hold up the parks that let the side down (Thorpe)*... Of course it does mean that if a park needs more money for some reason (perhaps, a massive delay on your big coaster), the others will lose out completely... It certainly wouldn't cost Chessie £4 million on crews to destroy classic theming, so why else did Zufari lose a lot of the budget? Because others in the pot needed it... To me, who knows nothing to nothing about business, that doesn't seem sensical... It seems more damaging and unrewarding to those doing well, whilst the ones doing badly get given a slap on the back for trying and given a grant to improve themselves, which they promptly spend on lights and speakers and call it a day... *PLEASE, bear in mind that this is from the financial side of things rather than an 'attack' on the park... It's well noted how bad the performance was of Thorpe in 2012, hence the change of budgeting...
  19. Universal Studios shouldn't be the benchmark though, as none of their attractions in their history can ever be classed as 'original'... The parks shouldn't be looking at maintenance or touch-ups to bring in guests, they SHOULD be doing those things regardless... Having such a view-point on it is the issue... So what if something isn't marketable or doesn't directly bring guests in? Whatever happened to producing the most quality product imaginable? You certainly don't see the likes of Universal or Disney leaving their rides to rot until replacement is required... Even Six Flags manage to repaint their coasters every few years, and they are reknown for being crap maintenance wise... You do maintenance and 'small' rethemes in ADDITION to major additions... Runaway is one of Chessie's major attractions, why is it being shafted?
  20. Nom Engineering though...
  21. Latest theory is that Andy's Mum is Emily from Toy Story 2 who abandoned Jessie... Hence the "Red Hat Theory"...
  22. I believe however the coaster construction tool is yet to be operational on it though, so currently the £22.99 gets you a path/scenery simulator... http://store.steampowered.com/app/254590/ I'm not sure how they will do the add-ons to the current system, I assume that if it's just updating, then it should be decent value for money...
  23. And it looks VILE! The one flaw in this ride so far...
×
×
  • Create New...