Everything posted by Mark9
-
Europa Park
Why is it Europa Park can build a whole road in about two weeks and yet the people doing the roadworks near my house have taken over 3 months and still aren't finished
-
Sea World
Manta Up-date*sighs*. Looks so good
-
Your Sexuality
People definitely need lessons in how to use the rolling eye smiley properly..
-
Your Sexuality
- Random
- Canada Creek Railway: The Bear Hunt
Aww. I always that that was just awesome theming. Darn- Future Of Chessington
Realistically it needs to change though. Chessington's basic infrastructure works around rides that are really starting to age now. Merlin have already proved they are not afraid to remove the relics what with the removal of Corkscrew, so I'm really starting to hope major changes occur at Cwoa. The majority of rides there are over twenty years old and the park is crying out for some up-dating.- Rant
They are annoyed in strictly because hes staying in over people that are far more talented. The argument is that obviously the public pay the license fee and should vote for who they like not for the best person. So really its up to you- Closed Rides
How do you know that they didn't find out and e-stopped it straight away. After-all its not as if a Colossus operator is stationed right next to the first drop. I doubt they thought they'd stop it half way up the lift for a laugh either. Sometimes I cannot believe some of the claims people come out with.- Saw- Construction Thread
She won't be back, don't worry Will, that's a very odd thing to want. You do know that the first ride will be exactly the same as every other ride on it yeah?- Vampire
It's odd because was down for 2-3 nights, but majority of the time it was open.- Closed Rides
Well to be honest who knows. The more important thing here is that a problem was noticed, the staff took the correct procedures and everyone was safe.(or for a more ruder response, how many rides do you operate Theme Park Bloke?)- Eclipse
- Saw- Construction Thread
I may be wrong.. but where has any of this been said?- The Future Of Vampire
Vampires is about 1000 yeah. The track wouldn't be able to support four seats in a row and besides there wouldn't be the clearance for that. It was built in a time when 2 a row was the norm. I think a major problem with Vampire is that when it goes it will be very hard for Chessington to replace. It upset the locals something chronic with the old trains which is why CWOA has lacked so much investment of late. Its hard to get anything built so rides that are there are, well built to last.- Eclipse
- Queue Times
The queue on open day was maximum of 5 minutes.. I'm thinking joke account..- Fairs
Breakdance Number 1If you ever get the chance to ride this.. do it. Gives many UK rides a run for their money.- This Or That
Buzzsaw would have been an awesome name.VK or WKD?- Depth Charge
Weight thing. To much on one and the boat ends up crashing into the end (was the most fun part of it actually!)- Depth Charge
I think to be honest, the long queue is purely down to the frankly abysmal throughputs the ride has. In the last three years they've even introduced that rule that teens can't ride together. So sometimes only four people are going down at a time which is so pathetic its unreal. Its a ride that has no place at a theme park that regularly attracts 10,000 people.- Eclipse
- Random
- Random