Everything posted by Kevin
-
Chessington General Discussion
- Rant
Big hill?Light slope mate, me and James did that hill well faster.- Sunday 30th August 2009 - Thorpe Park Summer Meetup
You'd better come Ruddy, haven't seen you in Ruddy ages- SAW: The Ride
Well you all go so regularly, don't you ever realize that this isn't good enough? Why do you all visit so much and then come on here and bitch about it?Either visit regularly and don't slate the place on things that are common place, or justify your comments by not visiting so much!- Marineland
- Jobs..
I work at one of Merlin's theme parks as a Host.Love it, very good fun.- Rush
It is theming for Fright Nights.Just in case that wasn't blatently obvious.- Rush
Being refurbished. Or broken.- Random
- The Blue Barnacle (Previously Black Buccaneer)
It is the highest and one of the largest in the world, it's also got a new Vortex style batching area.- Thorpe Park Staff
He would have been banned from all Merlin attractions.- SAW: The Ride
Proper terminology of gay:Don't use gay as some sort of insult.- Chessie Website
It would have it, but the only rides this year that have had more than 5 hours of downtime are Griffins and Rameses?- Park Music
It is used as park wide music when the Link computer has technical problems. Hence why it's in the video.- Closed Rides
And they're German rides, coupled with being old and printing off error reports in German probably is a headache for Engineering.- My photo challenge!
- Alton's MTDP
The station is designed incredibly well and for how much it costs normally I would say keep it.Or burn it, as it doesn't work properly.- Rameses Revenge
Part is arriving tomorrow, only right arm has a slight bit of scaffolding surrounding it.- Chessington Trip Plans
I'm going tomorrow!Oh, wait.- Rameses Revenge
Hopefully it will be back open tomorrow or Sunday- Michael Jackson
A true legend of music has passed on today. I'm truly saddened- Flamingo Land
Looks **** and has a capacity that is ****.- Vampire
Bose has 32SEs, it's the amps that need turning up. It's a huge station aswell, about 5 times as big as Colossus's station!- Chessington General Discussion
Yearly maintanence. Train 1,2,3 work from August to September, taken down to one train operation for quiet months after August, with train 1 taken off (or whatever the ones that is in the rota for the year), taken apart and put back together for March next year. That means train 1 is ready for October, so they have one fresh train for next March - Train 2 is then taken off in November and put back together for March, with all trains on the track for March (2 of them being fresh trains so they don't need to be taken apart for another year); then in May Train 3 is taken apart so it's ready for 3 train operation for August with three fresh trains, and the cycle starts again, which is currently where it is, however other problems have stopped 2 train operation for the time being.So it goes 1, 2, 3 available between March and May - 2, 3 between May and July, 1(F), 2, 3 in August, 3, 1(F) in September and 3(F), 1(F), 2 available for October.If that makes sense.- Chessington General Discussion
Rameses will be down for the forseeable future, it's been caked in scaffholding as of this morning - Griffins is the same and Vampire will be on one train foir the foreseeable future due to issues with other train (and the third is still in bits, before any cocky person asks about it!)Bit of a bugger eh. - Rant