2014
Brand new, state of the art park entrance and ticket kiosks with entrance music back.
Colossus and Nemesis Inferno to receive a repaint, and general touch ups in the area.
Loggers tunnel back!
Canada Creek Railway and Time Voyagers back in operation
Huge refurbishment for Rumba Rapids, with a new name and theme.
Throughput of all coasters increased (always run flat out when busy etc.)
2015
New woodie opens at the park. Either GCI or Intamin.
A few general touch ups around the park.
2016
New dark ride to replace Time Voyagers (something similar to Terror Castle at Brean, on a bigger scale)
Fright Nights event refurbished, with brand new terrifying mazes and the return of The Asylum.
X gets a fully refurbished queueline, keeping the new additions but improving upon them etc.
2017
Vortex and Samurai taken out, and new models put in (same ride type).
The each transformed into a large waterpark (Depth Charge stays).
All effects in the park kept working all year round.