Yesterday Swing A seemed to be working to almost full swing however swing B was terrible. It wasn't even reaching 90. Also the vast amount of staff on it was very odd, There were 3 people in the console room, 2 filling the bays, 1 by the exit and 1 for fast track. The queue never exceeded 30 mins but the cycle through the whole day was very short.