Jump to content

Project LC

Members
  • Posts

    1911
  • Joined

  • Last visited

  • Days Won

    7

Everything posted by Project LC

  1. If they get too out of sync the ride stops and one of the arms goes out of action, seems to be the general procedure.
  2. Vortex yesterday was bad in the morning but after a bit of downtime the ride was fantastic. I cant remember having it run so smoothly or for so long.
  3. Swing B never exceeded 90 degrees and felt very down on power while swing A seemed to operate with out problem. I went on swing B 3 times yesterday and my total airtime was none as it never had enough power or reached the correct height. Unfortunately we never got on Swing A but from the ground you could definitely see that it was reaching a higher height.
  4. I know that the person in console teaching a new ride op was called Steve.
  5. Yesterday Swing A seemed to be working to almost full swing however swing B was terrible. It wasn't even reaching 90. Also the vast amount of staff on it was very odd, There were 3 people in the console room, 2 filling the bays, 1 by the exit and 1 for fast track. The queue never exceeded 30 mins but the cycle through the whole day was very short.
  6. Project LC

    MTDP

    I was told a fair few years ago that Saw the ride was going where depth charge is. I wonder what happened to that idea.
×
×
  • Create New...