Jump to content

Project LC

Members
  • Posts

    1917
  • Joined

  • Last visited

  • Days Won

    7

Everything posted by Project LC

  1. Project LC

    Doctor Who

    It worked well with badwolf as it was a very minor role in the series and hardly noticeable unless you were looking for it. It made sense for the overall story arc to be there and added a layer of depth to the series. The problem with moffats overall stories is that they are the main story and not a subtle thing in the background. Also on many occasions he just rams in scenes that don't need to be there which ruin the episodes. (Into the dalek comes to mind)
  2. Its pretty similar to that image to be honest. It is missing the kink in the coaster though.
  3. The support structure is the most efficient they can get. Stealth style wouldn't work as the stress and strain on the track would be too large. It is Europe's tallest and fastest but why is that what they want. Coasters should push the edges of fun and some coaster that is just a smaller version of an American coaster isn't something I think PA should be doing.
  4. Ticket sale sites have the bandwidth and processing to deal with large amounts of traffic. Regardless of how good the tec, it will be slow but normally they stay up. When they don't have the gear they should try other promotions or variations on them. Otherwise they will crash and you get a load of people who don't understand how the internet works moaning because they missed out on 50p tickets.
  5. I still don't understand the point of this ride. It's acceleration won't be very good the top speed isn't very impressive and its height is a tad underwhelming. I have faith it will be popular for the park and offer a decent experience but I can't hep feeling it will be a bit of a let down.
  6. I thought IAC is still run by Merlin. When it hands over to Thorpe's operations I suspect there will be less actors. The same story for DBGT. The bottom line is actors are expensive and Thorpe are a business to maximise profit.
  7. It is very hard for servers to deal with so many requests at the same time. You need very large bandwidths and very powerful servers. Both of which theme parks don't have as they don't need them. These sorts of promotions would work far better if it was enter details over the course of a week and then it randomly selects people. They should not be done so everyone turns up at the same time.
  8. Perhaps TPM should hold a referendum on should Thorpe park leave the merlin group. #Thexit Joking aside Merlin are not all bad, by no means do I think they are good as I feel there are often missed opportunity's and poor decisions. However out of all the parks they own I feel they run Thorpe the best out of the other parks they own. While DBGT is delayed at least we are actually getting what we wanted unlike a disappointing SW8 and another year of nothing at chessington.
  9. Well the Pro-EU MPs threatening to block brexit if leave wins really shows they can't be trusted. Any mp who tries to block the referendum result will see there career ruined. Doing that would see ukip support sky rocket as would a remain vote. This referendum will be going on way past 2020.
  10. Actually multiple polls now have brexit ahead. I suspect it's because of Camerons terrible performance on sky while Goves was pretty good. The remainiacs endless economy doomed is wearing off as no one believes it to be anywhere near as bad as they are saying. Meanwhile Leave is focusing on immigration which is an argument they clearly win.
  11. They will spring a weekend opening with no hype, build up or media coverage at all. Doubtful.
  12. Project2018 LSM or Hydraulic launch?
  13. I think the current price is an arm and a leg.
  14. Project LC

    Wicker Man

    Parks will develop multiple layouts in multiple locations. So that when things happen they can still push out a new ride when its needed. An example is the provisional designs of LC12 where on a document you can see 3 coaster layouts all with a similar design and clearly all wing riders. Eventually they settled on the swarm and was not too different from the design on the document. I suspect what has happened here is that there were 2 or 3 designs in different locations for a wooden coaster and after the crash they ditched the ride at ripsaw for whatever reason and went with the flume site.
  15. Project LC

    Wicker Man

    The "dark ride" section is literally a couple of meters long as it passes under the station building. A preshow is nothing to really wow about it just sets the mood.
  16. Project LC

    Wicker Man

    That image is from a while ago and the creator was pretty much guessing heights. Hence why the lift hill looks so odd. I'm sure someone is working on a more upto date version. I can understand the negative reaction. My concern is it will be a bit like the swarm with a good layout and good theming but comes across as too short. Especially if that lift hill is launched.
  17. They will have general spare parts for items that regularly break or need replacing. It is not economically or practically viable to store spares for everything. Just be relived that stealth doesn't have the reliability of TTD or the operations of Kingda Ka. Launch coasters are very complex and lots can go wrong.
  18. Project LC

    Wicker Man

    I do hope this has no worlds first. A decent wooden coaster would be nice. Another concern is it seems rather short especially if its launched but hey ho I guess time will tell.
  19. Scum is a bit extreme. A lot or reports would have worked very hard to get where they are. The editors pressure for stories that people want to hear not the journalists.
  20. Well I originally said that sub Terra was a terrible experience which could contribute to why they don't want to open dbgt early. Word of mouth and all that. So that idea seems to have come from people misunderstanding what I said.
  21. What could be done which I imagine is quite appealing in merlin's eyes although may not compensate guests very well is if they gave out discount vouchers to be used in park. So they give you a xx% off voucher to be used in a merlin owned shop/restaurant/fastrack. So the customer feels they have got something meanwhile merlin makes money off of it. No idea how guests would respond to it or if it would work but it is only a suggestion. Really the issue with priority passes given out is that they don't account for it when selling fastracks and they give them out for pretty much anything.
  22. They did mention in the stream that the animation for stations are not ready yet. I imagine they will have included lowing stations for inverts, they have gone to crazy levels of realism I doubt they would not include that.
  23. The ride has to be the best it can be. When you spend huge amounts on a ride it has to be good or word will spread. Nemesis sub Terra had a bad word of mouth and look at it now. Merlin don't want a repeat of that, they want an attraction to pull people through the door to make them money. The creators will want it as good as possible as it's their child but management are money focused.
  24. I'm just hoping the cause for delay is something just hasn't been finished rather than something has been finished but it doesn't have the desired effect. Seeing as the latter is much harder to fix.
×
×
  • Create New...