-
Posts
1907 -
Joined
-
Last visited
-
Days Won
7
Content Type
Profiles
Forums
Blogs
Events
Posts posted by Project LC
-
-
Staff not updating it often enough. Has nearly always been the cause and suspect it will always be that way.
-
It saddens me to see people so much celebration for something that should have been the case from day one.
- Matt 236 and dragon2000
-
2
-
Flat roofs leak. The only thing guaranteed in the world of engineering.
-
Taking a train off early means engineers can start on it's checks early so they don't have to at the end of the day. It will also save the ride team a small amount of time at the end of the day.
Not defending them by any means just trying to explain there side of the story. Reducing capacity during the day is annoying and shouldn't be done.
-
A combination of the two I think, and the fact that slow capacity + long queues = Sp££dy Pass sales.
Increasing capacity requires getting the train ready which is a process that takes a lot of time. Not only that putting them away at the end of the day takes hours. If it's expected to be quiet then they will not have as many engineers on site so will not have the capability to add more trains.
While speedy passes do seem the reason they will not generate a huge sum of money compared to not hiring engineers for more hours.
-
Tinks is open however the pirate ship, vertigo, drenched, megafobia and bounce (apart from about 20 minutes this morning) have been closed all day.
Terrible weather as well so we left about 2:30 which is very rare for me to leave before closing.
-
Air
Nuclear fission or nuclear fusion?
-
My god that is an ugly piece of track. From an engineering point of view you would not save much steel in the support structure having it as a solid piece rather than 2 pieces. However it is easier to construct both in the factory and on site.
-
You will be waiting pretty much forever then I am afraid. All the UK parks which have the sort of money to build one are all limited by planning restrictions. The only possible park realistically is Thorpe and building one would have many issues.
-
They completed the pull through a few days ago so testing won't be far off if it hasn't started. Cedar point being the park it is will have some sort of official video of testing soon. They like to build the hype train that way.
-
Often the live Webcam's get turned around to face gatekeeper and the carpark for a while for no reason according to cedar point. However the reason is most likely to be the ride testing.
-
Mantis was a horrible creation and even though I found it enjoyable I can still see how bad the ride could be if you get the restraint wrong.
-
That is a considerable amount of cable. [insert speculation here].
-
Disney has a new film coming out of James and the Giant Peach. It will be well known.
-
I have to agree with Tommy here. UK theme parks do make mistakes and they all could undoubtedly be better, but if it doesn't stop people visiting then the issue will be low down on Thorpe Park's agenda.
You're not going to avoid going to Thorpe Park because Colossus is on 1 train operation are you?
Speak for yourself. Ill visit when they sort themselves out. If I knew before getting there that coasters were going to be on 1 train I just wouldn't go. They can have my money when they start getting things right and the issues they have are solved. Until that point they are not getting a penny.
It must be said that currently Thorpe are doing the best out of the Merlin group in my eyes and that some issues I have had with them in the past seem to have been fixed but then there are the major recurring ones. Fastrack on reduced capacity, terrible reliability...
-
-
Atari isn't really Atari anymore. They are a different company under the same name. Frontier wanted to do it there way. They didn't want to answer to a large publisher focusing on fast turn arounds to maximise profit.
RCTW has had 3 developers so far and is shambles just like Atari.
RTC4 we do not speak about. It's best left forgotten in the world of mobile games.
-
I imagine the queue time was a mistake.
-
I'm sure there is something left to ruin. Not sure what but there must be something.
-
-
If the last train or bus left early you would be pretty annoyed. If you say something will happen at a certain time and it's in high demand you don't release it early without telling people.
-
The point they are all making is the fact it went live at 9:5x. Servers are highly accurate in time keeping and don't just release it early. It would have been set up to release early either by accident or on purpose. Releasing it early is not fair. However I'm sure complaints would have happened even if it went live at 10.
-
-
The thing is this sale was never a sale in Merlin's eyes. It's a publicity stunt and releasing the tickets early has made the stunt even more successful. Most read story on BBC news for hours mentioning DBGT throughout the article. They couldn't have got better advertising if they tried. For once I think Thorpe have done pretty well.
Oh and the shop is looking pretty damn good.
SAW: The Ride
in General Discussion
Posted
Saw regularly closes from high winds. The over banked turn is a likely stall point and is the reason it closes in cold temperatures as well.
Stealth isn't too much affected from winds, swarm and saw are the worst. Colossus and saw suffer most from temperature.