Everything posted by Project LC
-
The Smiler
if the ride had the exact same layout it would have been limited to 3 cars per train and only having 4/5 trains its throughput would have been poor.
-
The Smiler
Then what did you mean by that then?
-
The Smiler
Lots of rides have problems with stalling. That is not the ride manufactures fault that is the track layout.
-
The Smiler
Interesting comment seeing as the ride operated as it should have. This was down to human error, not the ride. Gerst and intamin are the only really possible manufactures for the smiler anyway. Intamin would have had throughput issues so Gerst were pretty much the only option.
-
Europa Park
Fair enough, why would you want a spinning car on a megacoaster though?
-
Europa Park
Well I thought brave it backwards was a gimmick it would seem you can go one better. It looks stupid and like it wouldn't add much to the ride.
-
Jobs in the industry
I would quite like to engineer the static parts of the coaster. Like the station or even help with its construction. Being a project manager on a ride like the swarm would be a dream job for me. No idea how I would go about it but a degree in civil engineering seems a good start.
-
Merlin VIP Annual Pass
Saw, and the smiler did not have fastrack when they first opened. There were a couple of months when it ran with out it.
-
Logger's Leap
I think the correct response is
-
TPM Awards 2015
Hmm maybe its time for another RnR rant to make sure people know that the award should be mine.
-
TPM Awards 2015
I guess its almost time to change my avatar.
-
Derren Brown's Ghost Train: Rise of the Demon
- Which park got you into rides?
I like woodies that throw you around as I feel that is sort of the point. However with steel coasters I want a smooth ride. I despise rita for many reasons but a big factor is how rough it is. I suspect I will think the same of Baco.- Nemesis: Sub-Terra
I meant bad ride as in few ride it, costs a lot to run and has low satisfaction. My personal opinion of it is far less than bad. Alton want to minimise costs. So reducing the hours of NST is the obvious choice. To minimise the amount of people this disappoints you would close it at the hours where fewest ride it. The morning and an hour before park close.- Alton Towers News
Yeah the sort of people Thorpe, legoland and Cwoa employ.- Nemesis: Sub-Terra
- Alton Towers News
Because 0 hour contracts are useful to employers and are quite often favoured by the people on them.- Nemesis: Sub-Terra
- Derren Brown's Ghost Train: Rise of the Demon
Have you not been to chessington?- Blackpool Pleasure Beach
A rival in Blackpool would kill them both. Blackpool as a whole is in decline and having something take away more business from them would be disastrous. I'm with BPB on this one. A rival would damage the town in the long run.- Derren Brown's Ghost Train: Rise of the Demon
The plans show fire escapes where one has a staircase and he rest don't. It strongly suggests 2 floors. However there few lateral beams in the building to support a floor.- Derren Brown's Ghost Train: Rise of the Demon
£3m on the building, £5-15m on advertising. Remaining on theming and ride hardware. Now this is very likely to be screen based so that will take a large budget on animation/filming. So with all that the ride hardware comes to £10-20m. Now they are all rough estimates so I could be out by quite a lot. However an AGV for £30m would be a discount price. Another point to consider is AGVs struggle with elevation change. This is over 2 floors.- Derren Brown's Ghost Train: Rise of the Demon
AGV rides already exist. Also I did suggest this idea months ago. The problem with AGVs is that they are very expensive. The cost is coming down but the budget may not stretch that far.- Closed Rides
They want to encourage more people through the door at a time of low demand so they can get more money. Basic supply and demand stuff thorpe are following. Doubt there will be other reasons for the price drop.- Derren Brown's Ghost Train: Rise of the Demon
I think the no queue thing was referring to RnR which looks like in the mean time it has been scrapped. It could also mean a ride with a high throughput. I don't think its a statement which should be read too much into. - Which park got you into rides?