Jump to content

Stealth


Dan_Rush

Recommended Posts

So to bring some additional clarity to the situation...

 

-The park are awaiting a part. This is evident by the fact staff aren't working on it actively. This means it'll be closed a while. Even when the part arrives, they will require time to test it. 

 

-It is likely a bigger / more expensive / specialist part, hence why the park didn't have one already. This takes time to acquire; it's not like they ring up Intamin and say "Can we have 1 [thing from catalogue] please?" and Intamin ship it out the next day from their warehouse either. 

 

-Time frame is unclear at the moment. How long is a piece of string. 

 

-Thorpe have no intention of getting rid of Stealth. 

Link to comment
Share on other sites

2 hours ago, Jax said:

There was a small red crane in the plaza yesterday and the launch bunker doors were open

Thanks Jax that's interesting. So they must actively be working on it. I'm not entirely sure what's up with Stealth because I keep hearing mixed rumors. I've heard from somebody it's a launch cable needs replacing. But then I've read elsewhere that it's something to do with the accumulators for the launch or the pressure not building up for the launch.

 

Either way Stealth is my favourite ride and and I'm going Tuesday so I'm trying to stay optimistic that it will open but I have my doubts.

 

Does anybody know exactly what is wrong with Stealth? I can only think the launch mechanism as It's been down for a while.

 

Thanks to everybody though for sharing your views because they are super useful :)

Link to comment
Share on other sites

The accumulator issue was what closed it before (when it was closed on Passholder Day).

 

The issue currently is to do with the launch system itself, and as far as we know right now, is currently waiting for a part to arrive so they can fit it. As well as that they'd also need time to test it thoroughly and make sure everything is ready for operation again.

 

I'd imagine it'd be back open within the next 2 weeks, if not the end of the month. They may have it ready for May half term but your guess is as good as mine currently.

 

Hope this helps :)

Link to comment
Share on other sites

5 minutes ago, Jax said:

The accumulator issue was what closed it before (when it was closed on Passholder Day).

 

The issue currently is to do with the launch system itself, and as far as we know right now, is currently waiting for a part to arrive so they can fit it. As well as that they'd also need time to test it thoroughly and make sure everything is ready for operation again.

 

I'd imagine it'd be back open within the next 2 weeks, if not the end of the month. They may have it ready for May half term but your guess is as good as mine currently.

 

Hope this helps :)

 

Thanks Jax your super useful. So the crane yesterday may not of been relevant to Stealth? I know it's a very complex ride to work on and apparently Intamin won't support the current accelerator model so I'd imagine that Thrope are having a hard time at the moment. I guess it could be one reason to not to do business with Intamin in the future if that's the case. I definitely think they should support Thorpe since they manufactured the ride so it's a rather sad story. 

I could only think that the part they need could have to be custom made and then authorized by Intamin to be used on the ride which I guess is a long process. 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...