  1. Actually with the right admixtures it will 😏 once the chemical reaction starts, hence how concrete can be poured under water. However generally you are correct, concrete isn’t poured in the rain as the increase in water content affects concrete strength. Not something you want in a coaster of this size!!
    1 point
  2. Just to add to this - concrete doesn't set when it's peeing it down with rain πŸ˜†
    1 point
  3. MattyMoo

    Slammer

    Slammer won't be removed until they have something to go in it's place or plans for the area, I guarantee. If they haven't fixed/replaced an on it's last legs screen, or have multi-coloured tarmac all over the place due to laying cables or whatever, then I can't see them spending money on removing an SBNO ride that is sort-of hidden and next to a not very popular "experience".
    1 point
  4. Reminder of the rough timespan. Just over 2.5 months allocated for the vertical construction.
    1 point
  5. Vertical construction will probably be starting September / October time. For a point of reference, Swarm's didn't start until late September, and only took about 30 days.