Jump to content

Kevin

Members
  • Posts

    748
  • Joined

  • Last visited

Everything posted by Kevin

  1. There was a right bellend operating Bucc though..
  2. Kevin

    Random

    Katy B - Katy on a Mission... what do people think?As someone who is into dubstep I feel it a slight pity it's becoming so mainstream, but hey it's still a goodun.
  3. Lets hope the Queen gets them too, that first turn is a mother if you don't properly brace yourself.
  4. 950 is £1 single for staff. Show staff pass.Quicket way from Sunbury is 290 or 216, whichever turns up first.
  5. I know of;Spanish Flea - Herp AlbertMexican Hat Dance - GenericCancio del Mariachi - Los Lobos and Antonio BanderasAnyone else for the others?
  6. Kevin

    Random

    Sprinkles?Ride queueline cleaned?
  7. Yep, will be a fair bit of time until it reopens too.
  8. You could not have ridden Samurai by yourself, as it's been said repeatedly it's a minimum of 15 people, end of.And a fair ride is different, because it's powered by Diesel, not main line electric. Simples.
  9. Chessington has been on average 95 - 97% uptime.And yes, unfortunately people seem to think shouting and screaming will make the rides work and that it is the poor sod at the front gate is the person at fault.
  10. Kevin

    Slammer

    Then something major has happened to it, especially if it has tarp over it.If it had something small it'd have a staff member at the entrance informing people it was closed - Ricky you don't seem to know what you're talking about, you do come out with a lot of bollocks pretending you know park operations inside out when you're only a mere 16 year old.
  11. The restriction is anyone can now sit wherever they want, as long as there is an adult at the end of each row, with the new height restriction as 1m to 1.3m.As guests and fanboys rarely realise, it's the law; the insurers insure the ride from faults for guests between these restrictions, and to be fair if people don't like it, that's their problem.Simples!
  12. The ride manufacturer was called in last week to do what MikeyT said, they did that overnight.It was closed for structural work for a week or so in June.
  13. Absolutely diabolical service from Chessington, it's gone absolutely crazy on overselling Exp's, making it's blindingly unmanageable. Same for exit passes - it's just such un joined up management to try and provide quick fixes.So you've got a 150 minute queue for Vampire, 75 for Runaway, Bubbleworks, and other 'just under signature ride' level, what do you do to sort this out? Cut selling Exp's down to 500 instead of 1750, stop giving out Exit passes, and stop giving disability wristbands for such stupid reasons and manage it properly.
  14. I think all the scenes with the exception of Lift and fountain are somewhat above Vamp?
  15. Is on Two Train operation, will be operational with three trains when parts have come in, after 26th August.
  16. Yeah the new branding looks pretty good with all spelling mistakes tidied (minimun lol). Noone seems to know what the branding is actually for though..
  17. Kevin

    Random

    OH JACK DAMN IT
  18. That's actually pretty cool, for pisspoor standards of marketing.
×
×
  • Create New...