Everything posted by JoshC.
-
Derren Brown's Ghost Train: Rise of the Demon
Saw, Th13teen, Raptor, Swarm, Polar X-Plorer, Flug, Oblivion Black Hole all say hi.
-
Derren Brown's Ghost Train: Rise of the Demon
For the record, I believe the train that was behind BBQ is now inside the building. There's also likely more of them already inside. Maybe the delay could also be down to wanting to open on full capacity rather than part capacity?
-
News Desk
The worst thing about this change is that pluk has gotten rid of his monkey face avatar.
-
Backstage tours
Nope; just head to the exit of the coaster you've chosen at the end of the day (unless they've already told you to go elsewhere)
- The Swarm
- The Swarm
-
Derren Brown's Ghost Train: Rise of the Demon
Actors haven't been officially confirmed, just live action. However, a couple of articles, which feature quotes from Merlin not lifted from press releases, have mentioned actors, so it seems pretty certain now. On a different note, here's a video from ExposureDigital, who were involved with the creation of mindswanted.co.uk
-
Wicker Man
Pre show building? Obviously going to be the world's first coaster with a washing machine element.
-
Pop Badges
http://www.treasuretally.com/collections/legoland-pop-badges-2016 They're pentagons
-
Derren Brown's Ghost Train: Rise of the Demon
Interesting you mention about it being "rated 12". It's not any sort of rating, it's just a recommendation the park set themselves in case someone young finds anything disturbing. It'd be interesting if the BBFC, for example, did have to age rate some (screen based) attractions in the UK. Surely the disturbing / upsetting nature of the film in The Passing could have warranted a 12A rating, or maybe even a 15? I know that Hobs Pit has a rating from the BBFC, and from what I heard, they had to change things about since it would have been rated 15 otherwise. And course, Sub Terra also apparently had one, but since there's no reference other than a recommended age limit, I don't quite know if that was a publicity stunt?
-
The 2016 Thread
^I blame not enough caffeine... Already been done
-
The 2016 Thread
>The year is 2016. >2016/14 = 144. >144 years ago was 1872. >Derren Brown's Ghost Train is set in 1871. >DBGT sequel maze confirmed. Next!
- X
-
Derren Brown's Ghost Train: Rise of the Demon
To be fair, I don't think they've said "first to ride" in the minds wanted competition, but instead to just attend an exclusive VIP / press night? So they could in theory do soft openings (or they would like to call it) without making the competition seem pointless. That's not to say I think there will be soft openings, but I don't think it should be ruled out.
-
The News
BREAKING NEWS - FAMOUS PEOPLE NOT IMMUNE TO DEATH
-
Derren Brown's Ghost Train: Rise of the Demon
As Ryan says, this isn't something exclusive to Merlin. For recent examples at major parks, look at Baron's July opening last year at Efteling and Taron at Phantasialand (with it's still unknown opening date). Even parks like Plopsaland and Hansa have done it, so it really isn't uncommon. I can see the appeal, as it means that there's less pressure to finish off an attraction during the winter months, where weather can create delays in the construction schedule. At the same time, this doesn't really explain the likes of ABL, IAC or Galactica, for example, all of which didn't open with the rest of the park (though I guess if you look at them on a case-by-case basis, they all have their reasons). It also means there's good opportunities for on park advertising, encouraging return visits and building up into the busiest time of the season.
-
Derren Brown's Ghost Train: Rise of the Demon
I see people's concerns given that Smiler was planned to open on 23rd May 2013 until the 22nd May. However, given some of the unfavourable publicity Thorpe received from the 12p ticket thing, plus there still being a close eye on Merlin from last year, I would assume that if it were to be delayed, they would announce it within a reasonable time frame.
-
Derren Brown's Ghost Train: Rise of the Demon
A couple of photos from today: Couple of these signs have been put up. Possibly a good sign that the ride will be opening on time; what's the point of directing people to a ride's entrance which won't be opening for a long time? Don't know if this is new or something I just haven't seen before? Sorry for blurriness, but there's loads of these corner supports in the queue now. Nothing else of note to mention. Train carriage (if it's still outside) is completely covered so you can't see a thing!
-
iOS Thorpe Park Mobile Application & Virtual Queue
For the record, Thorpe have said via Twitter that they don't plan on running RnR this season.
-
Bolliger and Mabillard
TPM social to Heide please. Chuck in Hansa for Gerstlauer goodness too if you like.
-
Phantasialand
Name/logo of restaurant from PhantaFriends.de, which will be serving Bavarian food... The restaurant is still being constructed from what I can gather, and is Raik-side of Klugheim. Speaking of Raik, it is now testing.
-
Samurai
If the reason for the closure is because of an incident on another Top Scan, I imagine Thorpe/Merlin will want to be as safe as possible and cover all bases. Following the Smiler incident last year, it's not all that surprising they want to be extra careful. I'm sure if they could cover all their rides and guests in bubble wrap, they would.
-
What is ? saying?
terrortomb: "Still a better ride than Storm Surge...still a better ride than Storm Surge..."
-
Merlin Name Mania!
I personally cannot wait until Towers' SW19, the world's first theme park ride sponsored by a tennis competition.
-
Derren Brown's Ghost Train: Rise of the Demon
Here's a press release and a close up photo of the demon... http://thorpeparkmania.co.uk/news/18-04-2016/Terrifying+Creature+from+Derren+Browns+Ghost+Train