Jump to content

Liam T

Members
  • Posts

    567
  • Joined

  • Last visited

Posts posted by Liam T

  1. So love it or hate it, Snow has arrived! Share you lovely white covered back gardens or even pets playing in the snow pictures here! To kick it off, here's a picture of last years major snowfall and clever ways to keep the milk cold :)Posted Image

  2. Some more information, thanks to Theme Uk

    • The entrance will be located behind Rameses Revenge.
    • Also an second entrance in the Wanyama Village.
    • A pre-show video lasting approx 3 minutes.
    • The ride itself will last between 10-15 minutes.
    • The new animals include White Rhino, Giraffe and Flamingos.
    The alternate plan as also been added for moving the Monkey and Bird gardens, and Trail of the Kings to the same location, their for making all the zoo on one side of the resort and making more room for the theme park side
  3. A member on TTF posting something.. strange and interesting.Member consult224 said

    Hello all,I have been reading over your comments on the forum but I feel I should add, this is not a Gerst. coaster. How do I know? well I work for one of the firms involved in designing this project, But I can confidently tell you all that this will not be a Gerst/ but will be a well known manufacturer and I am sure that you shall be impressed by the new coaster.Also when we took the noise readings yes these were compared to SAW and so this was based around SAW. It is not uncommon as most of you are aware for a company to change designs of things / products. The coaster itself does not require to have Planning Consent it is merely the building for the station, ancillary and shop that is required to do so.The finished product of track design and layout I am sure you will be pleased with and also the type of trains / car being used.You will appreciate I cannot comment much on this project too much at this stage but AT shall make an announcemnet in the near future to you all on this exciting new development.

    Make of it what you will? But most people have called it lies and just made up, but it does say it won't be a Gerstlauer but they don't say what it will be..I would personal like a Gerstlauer because the NL made is look so sexy and flow around the track with ease!
  4. I'm not sure on the Euro-Fighter but the application said

    3.1 Noise from the planned new coaster was modelled based on a similar one located atThorpe Park. The Thorpe Park ride, “Saw” is the same type and manufacturer as theproposed ride

    Saw is a Euro-Fighter so if its the same type than it has to be a Euro-Fighter, but anything could happen, the next two months will be very busy, once its approved its down with the tent straight away, ill be shocked if we don't see little signs outside x-sector on opening day
  5. I'm struggling to understand the plans as well. Am I right in thinking that the track must either leave or enter the station... through the maintenence building?! That seems very strange.Also, can someone point out where the lift hills are, because for some reason I can't seem to be able to find them on the site plan.P.S. How come alton have gotten away with just saying the dimensions for the theming, where as thorpe had to show the whole plane thing?

    The first lift hill leave the station under the maintence building and returns at the same height as the maintence building, leading people to think about what happeneds inside the ride buildingAnd the theming plans haven't been written up yet so we will see them soonAnd it doesn't have a “beyond vertical” drop :P I think its saying that saw has and that makes limited noise.For anyone who is confuse I hope this clears it upPosted ImageThanks to Morgano of Ttf
  6. All at school today I was thinking "I hope it is a Gerstlauer"Omg its amazing, talk about two years ago family coaster next year metal thrill coaster! :DThis is what Alton needed, and looks like some major theming as good (or better) than the swarmsBring on 2013!

×
×
  • Create New...