Always better when Merlin Magic Making is involved.
This is no way to dis the entertainments team at Thorpe. However, I find the quality at Thorpe when entertainments make an attraction with external contractors differs from a proper MMM attraction.
Post DBGT I don’t think MMM have missed a mark with attraction considering budgets and constraints. They envisaged the original concept for the ride so it’s only fair that they make it work which I’m glad about.
For me, I am 100% sure that the budget will make or break this ride. Higher budget = more changes, Lower = Temporary fixes and short term ride
If they want a reridable ride, will they keep the fake shop? If you have to wait every time. It won’t be rerideable, Jack did hint saying that DBGT wasn’t rerideable