Get Vekoma in again and do a complete refurb, new track, new lift hills (tyre driven ftw) and above all, get those bloody fab SFC trains on there...
Though they'd need a new blocking system, I doubt tyre lifts would cope with a lot of stop/starting (if they can even do it of course)...