Jump to content

Project LC

Members
  • Posts

    1911
  • Joined

  • Last visited

  • Days Won

    7

Everything posted by Project LC

  1. If the last train or bus left early you would be pretty annoyed. If you say something will happen at a certain time and it's in high demand you don't release it early without telling people.
  2. The point they are all making is the fact it went live at 9:5x. Servers are highly accurate in time keeping and don't just release it early. It would have been set up to release early either by accident or on purpose. Releasing it early is not fair. However I'm sure complaints would have happened even if it went live at 10.
  3. You can never escape Thorpe Park Mania.
  4. The thing is this sale was never a sale in Merlin's eyes. It's a publicity stunt and releasing the tickets early has made the stunt even more successful. Most read story on BBC news for hours mentioning DBGT throughout the article. They couldn't have got better advertising if they tried. For once I think Thorpe have done pretty well. Oh and the shop is looking pretty damn good.
  5. Currently the game runs amazingly well. My laptop is well below the minimum requirements and its handling it at a steady 30fps.
  6. I wasn't having a dig at Alton Towers, I was just saying why they were cut instead of other departments. I couldn't care less about some entertainers wandering round the park.
  7. And for those who cant be asked to read about the alpha there is useful video summing it up. https://youtu.be/QGptxcdvQHE
  8. It would not surprise me if those jobs were all cut, as to merlin they are a waste of money as they are not needed nor do they bring in money.
  9. The smiler and Colossus both suffer a lot from temperature when it comes to speed and smoothness. Ride the smiler again when its warmer and I'm sure it will be more enjoyable.
  10. Well it clearly wasn't a last minute choice where engineers came in one day and decided to turn them around. Thorpe could have at least removed a fence, I know merlin were trying to put up as many fences as possible this year but taking down some cant have been too hard. Not removing it from the queue time board is an amazingly simple job and would have consisted of changing a single setting. How can a park not get something so simple right.
  11. They use points in the queue line to work out the time. However at the beginning of the season the rides are not getting the throughput for the points to be correct. As they staff become more experienced they will become more accurate.
  12. Project LC

    Wicker Man

    Or perhaps the world's first ride designed by (insert itv/channel 4 celebrity here)
  13. Project LC

    Wicker Man

    World's first physco VR log flume with live actors.
  14. Project LC

    Wicker Man

    A dark ride started out with an idea with potential to make a lot of money. A high investment log flume in the UK where rain is the main weather is just a bad idea from the start.
  15. Project LC

    Wicker Man

    A decent multi launch hugging the ground a bit like maverick would make for an amazing ride and one that would benefit Alton's line up greatly. However I doubt this ride will be that. I feel this is going to be a family friendly world's first gimmick. I don't think SW8 will be a flume replacement. I feel Merlin have enough sense to know a high investment long flume would not bring a very big return.
  16. Project LC

    Wicker Man

    Yeah because sw1 2 and 3 were all record breakers.
  17. I was actually asking to know what the answer was or am I not allowed to be curious and ask questions any more. At no point was I going to complain about something which I think is a good idea. I don't just complain at merlin for the sake of it contrary to your belief.
  18. It seems an odd move to remove something which seemed to be making them money. My only assumption was that it must make maintenance easier/cheaper or able to remove staff members.
  19. If you honestly believe that a ride which is actor heavy and using experimental VR will still be a great attraction as it is in its opening year then you are far more trusting in Merlin than you should be. I have faith that this will be a good attraction when it opens. I have very little faith it will stay that way.
  20. It doesn't matter how good the ride is. It's using actors so in a few years time it will be an incomplete experience. Merlin are incapable of learning as they have proven time and time again. I hope simworxs have an amazing ride system as that is the only thing that will keep this attraction around for more than 5 years.
  21. Anyone know the reason why they have turned it back round? I'm assuming it's cheaper somehow.
  22. Project LC

    Wicker Man

    Intamin Multilaunch which was originally designed as an aquatrax.
  23. Project LC

    Wicker Man

    I take it this means we are not getting the woodie any time soon.
  24. Well this is not exactly a new thing. If it was a one off then I'm sure we would all understand. However this keeps happening. Multiple rides not being ready for the start of the season. The chance of 4+ rides having a last minute fault year on year is incredibly low. Besides most parks scheduling accounts for delays like you mentioned. Something clearly isn't as good on the maintenance side as it is at other parks. Could be bad management, lack of staff, ageing neglected rides, the list goes on.
  25. For the budget they had I do not care if they use tarmac. For the budget DBGT has that floor is just a joke.
×
×
  • Create New...