Everything posted by Mattgwise
- 
	
		
		Park Operations
		
		Slow dispatches really with the train sitting/stacking in the brake run for considerable amounts of time a lot of the year. I don't like the new system where you are told which bay to go to in the station either.
 - 
	
		
		Vampire
		
		I am pretty sure the old trains didn't have seat belts on the restraints which would have been a factor into slowing down loading since the current trains were put in place.
 - 
	
		
		Cedar Point
		
		Steel Vengeance announced at Cedar Point, looks awesome. Some facts mentioned in the live video on Cedar Points FB page: 205ft Tall with 200ft drop making it the only hyper hybrid 90 degree drop 74mph 5,740ft long 4 inversions. A phenomenal 27.2 seconds of airtime making it have more airtime than any other coaster The ride breaks many records for the park as a whole as well including: Most coaster track in 1 park: 11.4 miles Most steel track in 1 park: 11 miles Most coasters over 200ft: 6 Most rides in 1 park: 71 Most coasters in 1 park with 90 degree or more drops: 5 Really hope I can get out to Cedar Point next year. The park have partnered with Planet Coaster and there will be an update at 5:30 containing the Steel Vengeance coaster.
 - 
	
		
		Vampire
		
		Chessington are just laughable sometimes. Post on their FB page to celebrate national rollercoaster day says: "did you know in 2002 Vampire became the WORLD’s first floorless rollercoaster?!"
 - 
	
		
		Park Music
		
		Yes agreed, it is great for the lost city area, but not great for Colossus. That area should have been left untouched with the original Colossus theme.
 - 2017 Season General Discussion
 - 
	
		
		Thorpe Ticket Kiosks
		
		There is was a sign Saturday saying for all day tickets head to the annual pass building.
 - 
	
		
		Park Music
		
		Beach and Flying Fish has been playing Tidal Wave loop of WWTP radio I believe since last year.
 - 
	
		
		Vampire
		
		Totally agree and it would be the only way to add a few more years of life to the ride. Although wouldn't want to lose that iconic arrow suspended lift hill sound ?. The train stopping in the station has always been an issue. Generally surprised there hasn't been a way of sorting that out.
 - 
	
		
		Park Music
		
		The overall track is longer but I find this much more repetitive than the old one. The old track consisted of completely different sounding parts ranging from slow, upbeat and tense bits. This new one essentially repeats one aspect of the old theme many times, throws in the island theme and then just sounds slow and samey for the rest.
 - 
	
		
		Chessington General Discussion
		
		Who remembers this. I used to be obsessed with this as a kid in the 90s.
 - 
	
		
		Vampire
		
		Rare video of a modern train vampire running with three trains and slowing/stopping on the lifts back in 2010. You can see a train already at the top of the first lift as another leaves swoops over the buildings in Transylvania as it was at the time.
 - 
	
		
		Park Music
		
		Had a listen of the Colossus soundtrack yesterday and personally I prefer the old one. It is too slow paced, echoey, overplays the island melody and it just sounded blander. Shame as I love the island soundtrack. Who knows it may grow on me. I guess Nemesis Inferno will be next so made the most of listening to that yesterday, even if it did keep cutting out. Yes, noticed yesterday, Tidal Wave area of Amity was much louder than before, a big improvement. As Marc said, it is good to still be noticing dead zones and speakers that haven't worked for a long time getting sorted out, so good job to the team:)
 - 
	
		
		Chessington Howl'o'ween
		
		Alton Towers have done mazes as paid extras for years and it works. It might help reduce the queue for it. But then again saying that everyone has always been used to paying extra. Down here where it has always been included is sure to cause moaning, complaining and whining from the guests.
 - 
	
		
		Park Music
		
		That is surprising. I'm pretty sure I read somewhere they were leaving Colossus as it was. Still I look forward to hearing it.
 - 
	
		
		Phantasialand
		
		Wow they don't mess about do they. Interesting that this flyer is using their newer suspended coaster track. I'm wondering if the trains will be two across seating rather than the four across of some of the older flyers as the track doesn't look any wider than the suspended coaster style. Still at least that's the smoother Vekoma Track.
 - 
	
		
		Park Music
		
		Well I guess one way to look at it is that Britain is multicultural and we have people from all over the world living here so any accent could work in that sense.
 - 
	
		
		Thorpe Park's Old Days
		
		Another great video with some footage of Flying Fish, Teacup Twisters, Carousel Kingdom Soft Play, CCR and the Treasure Island railway and Pirate show.
 - 
	
		
		Fright Nights 2017
		
		Walking dead really is worth looking into. It's a fantastic series full of drama, character and emotion. I'd be very surprised if it didn't get you hooked.
 - 
	
		
		Park Music
		
		Hmmm. Better than before but swarm island is set in Britain!
 - 
	
		
		2017 Season General Discussion
		
		On every single one of my visits for the last two years Swarm ends up less than 15 mins after about 4pm and 5 mins by around half hour before closing. Everyone goes to this at park opening and it generates a large queue earlier on. Many then don't bother going back to that area as its a dead end.
 - 2017 Season General Discussion
 - 
	
		
		Universal Studios Florida
		
		Well Thorpe like world records. Worlds first park to have triple B&M inverts. haha
 - 
	
		
		Universal Studios Florida
		
		I just hope these coasters aren't simply scrapped, but sold on to another place, even if separately.
 - 
	
		
		Park Music
		
		Last time I queued around a month ago there were only around 3 or 4 speakers working, all along one same part of the queue towards the middle section. I'm sure they are aware and will work on it now there is a dedicated, passionate team and time being spent on things like this.