Sphinxy Posted March 20, 2012 Report Share Posted March 20, 2012 Dumb question time, but what is wrong with it? Is it the same thing going wrong over and over, or is there a long list of issues with new ones occurring all the time?Surely S+S must be held financially responsible for issues which have never been resolved since installation?I think it's just that the ride has alot of parts and just isn't designed too well.I have no idea if the other one has the same problems but the ride just seems to be flawed in it's design. Quote Link to comment Share on other sites More sharing options...
Mccy Posted March 20, 2012 Report Share Posted March 20, 2012 My understanding of it is that the stresses on the central column/drive wheels etc are very high and they undergo fatigue which leads to cracks and fractures. The daily checks are to make sure that if a crack is found in time it can be welded shut before it fast fractures through and breaks the component.Usually when it's down for a while it's due to waiting on a replacement part because of the previous one breaking. Quote Link to comment Share on other sites More sharing options...
Bubbles1 Posted March 20, 2012 Report Share Posted March 20, 2012 I get the feeling that S&S did their maths wrong. if so, it would be their fault so they should be made to pay for at least some of the damage. Quote Link to comment Share on other sites More sharing options...
Dodge2002 Posted March 20, 2012 Report Share Posted March 20, 2012 The joints were covered in crack detection paint, the other day.You just have to ride it to comprehend the ridiculous amount of stress the ride goes under, it almost boggles the mind when it stops to spin the other way how much pressure it must endure.I'd assume a lot of day to day down time is due to the air compressor flagging errors (I'm assuming its air powered?). It's a dangerous thing, if something goes wrong that tank could go boom and destroy most of the surrounding area! Much like a car engine, the amount of pressure going through probably a very small gap has to be absolutely perfect, and it wont budge until that requirement is met. Quote Link to comment Share on other sites More sharing options...
Flipper Posted March 20, 2012 Report Share Posted March 20, 2012 Mixed with the fact that it is so unique, for the right or wrong reasons; it has to have parts made for it, as S&S no longer stock spare parts... Quote Link to comment Share on other sites More sharing options...
Mccy Posted March 20, 2012 Report Share Posted March 20, 2012 There are thousands of reasons it could have minor downtime. While it is powered by air, it's rarely a problem. Usually it is to do with an operator error (you have to manually lower the ride from both sides at the same time within a 10 second window, if not it stays at the top), a balancing issue (the guest weight needs to be almost equal on either side due to rotational stability issues) or a restraint problem (if there is moisture in the lock detection system, the ride may not register a seat as locked meaning it won't run).Extended downtime is usually due to waiting on external companies to manufacture specific parts as SAWROB said. Quote Link to comment Share on other sites More sharing options...
Dan9 Posted March 21, 2012 Report Share Posted March 21, 2012 ...or a restraint problem (if there is moisture in the lock detection system, the ride may not register a seat as locked meaning it won't run).Surely that's a fairly fundamental issue? I don't know how easily or frequently this can become an issue, but since you flagged it up as a primary one and considering it's in its eighth year of operation you'd have thought S&S would have a restraint locking system which doesn't allow moisture into it or to affect it so harshly. I'm hardly very clued up on technical stuff as you can probably tell but this stuck out at me as fairly common sense... if Inferno can pound round in the rain without having restraint issues why would they let Slammer suffer so easily? Quote Link to comment Share on other sites More sharing options...
Marc Posted March 21, 2012 Report Share Posted March 21, 2012 Its had them since day one, I remember back in 2005 when it rained they had huge covers for the paddles to try keep them as dry as possible, its odd how this dont seem to affect rush though.Its a shame but with all the above taken in to consideration, the ride cant have that long left, can it? Quote Link to comment Share on other sites More sharing options...
Stokesyboy Posted March 21, 2012 Report Share Posted March 21, 2012 I don't want to see it go because I really enjoy it, but sadly because of it's poor loading and amount of downtime it's had I can't see it being there next year Quote Link to comment Share on other sites More sharing options...
Crafty Posted March 21, 2012 Report Share Posted March 21, 2012 I remember when I was looking at the website before my first visit to thorpe, I was looking at the ride list and Slammer was the one that looked proper scary to me. When we arrived at the park the entrance seemed quite hidden away and there was no queue (it was a hot, busy day), overall it was quite a disappointment. I was expecting it to be a main thrill ride, instead it just seems a side piece. Overall I agree with you guys I can't see it lasting much longer with the constant downtime and it doesn't seem very popular, which is a shame Quote Link to comment Share on other sites More sharing options...
TN Jonny Posted March 21, 2012 Report Share Posted March 21, 2012 If we have and little big planet ps3 players on here search Jskiddy I made a slammer level I've also made it with controls but having uploaded it yet. Quote Link to comment Share on other sites More sharing options...
Tom G Posted April 1, 2012 Report Share Posted April 1, 2012 I managed to get on this for the first time two weeks ago. I really enjoyed it and it was very different, but the loading procedure and just the way the ride parks etc is really detrimental to its success. Quote Link to comment Share on other sites More sharing options...
Ryan Posted April 1, 2012 Report Share Posted April 1, 2012 My sources from the park have said there has been a major incident on Slammer and it fell down Sidders, Tom and Cornflakes 3 Quote Link to comment Share on other sites More sharing options...
Tom Posted April 1, 2012 Report Share Posted April 1, 2012 I heard from the staff that they're taking it down and putting in a whole other X: No Way Out to increase capacity for the original. Ryan 1 Quote Link to comment Share on other sites More sharing options...
Benin Posted April 1, 2012 Report Share Posted April 1, 2012 Oh... So we're NOT getting another 5 Storm Surge clones? I'm disappointed Quote Link to comment Share on other sites More sharing options...
Bubbles1 Posted April 1, 2012 Report Share Posted April 1, 2012 My sources from the park have said there has been a major incident on Slammer and it fell downJeez that's bad, and I can imagine how easily that could happen. Was anyone on it at the time, because that would really suck. If this is true, then I expect we can say bye bye to slammer. Quote Link to comment Share on other sites More sharing options...
Ryan Posted April 1, 2012 Report Share Posted April 1, 2012 Jeez that's bad, and I can imagine how easily that could happen. Was anyone on it at the time, because that would really suck.If this is true, then I expect we can say bye bye to slammer.April fools Quote Link to comment Share on other sites More sharing options...
Bubbles1 Posted April 1, 2012 Report Share Posted April 1, 2012 You disgust me.I kid, that was a good one. Anyone see the YouTube April fools? Ryan 1 Quote Link to comment Share on other sites More sharing options...
StevenVig Posted June 25, 2012 Report Share Posted June 25, 2012 Looks like the end could be upon us.... Quote Link to comment Share on other sites More sharing options...
dragon2000 Posted June 25, 2012 Report Share Posted June 25, 2012 Thorpe Park have themselves said on their Facebook page that they are awaiting parts and have no plans to remove Slammer. I imagine they have simply taken the sign down to minimise the attention drawn to the ride. Personally I hope Slammer is around for years to come - always find it thrilling and it really is a rarity. Quote Link to comment Share on other sites More sharing options...
Marc Posted June 25, 2012 Report Share Posted June 25, 2012 Its all a little odd, in years gone by slammers had months at a time down and they've never removed the signs for it. I do hope it reopens, but I guess it could be a fair while if they have removed the signs around the ride! Quote Link to comment Share on other sites More sharing options...
StevenVig Posted June 25, 2012 Report Share Posted June 25, 2012 I imagine they have simply taken the sign down to minimise the attention drawn to the ride. Yes because it is now completely invisible.... Quote Link to comment Share on other sites More sharing options...
c1hrisin Posted June 25, 2012 Report Share Posted June 25, 2012 They could be giving it a complete redo.. change the theme completely due to new types of restraints or parts that look idfferent and the entrance sign would be updated aswell. Which is one option? Maybe they are trying to re-sell it Quote Link to comment Share on other sites More sharing options...
Benin Posted June 25, 2012 Report Share Posted June 25, 2012 Well, it won't take much to retheme it would it? Be a shame to see it go, but it's unreliable and the park must be considering whether it's cost effective to keep it... A shame, but often some things need to be chopped to stop wasting resources... Quote Link to comment Share on other sites More sharing options...
Coaster Posted June 25, 2012 Report Share Posted June 25, 2012 I would like to see it get a new theme and restraints. DEFINATLEY new restraints! I really hope they don't get rid of it because in my opinion it is the park's scariest ride! Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.