Jump to content

Derren Brown's Ghost Train: Rise of the Demon


Marc

Recommended Posts

Tbh take every single ride at Thorpe look at staff when rides opened vs now....

X lost its indoor queue due to staff cuts. Loosing staff directly lead to limits on the number of people in the building.

Stealth opened with 10 or more staff , I havent seen 4 people loading in a long time. It currently on 2 trains runs with 6-7 staff

Colossus arguably the biggest coaster at thorpe suffers with bad throughputs due to design issues that plague it in terms of when you can dispatch trains and the restraint issues, but thorpe now rarely have 5 staff on Colossus 4 loading and operator.

The list goes on ....whilst even popular rides have massive cuts imagine the impact on the not so big ones

Link to comment
Share on other sites

Honestly I understand the track record of Thorpe Park and Merlin with actor attractions but this is their largest ever investment and surely they can't screw this up... Also, we have no idea what's inside. Maybe only a couple of actors are needed... or maybe 10+... then I'd be worried

Sent from my SM-G900F using Tapatalk

Link to comment
Share on other sites

I haven't had time to look at all of these, they are full of secrets and stuff, but I noticed a few things:
 

-"Fear is a fascinating thing" - Like the Dungeons Motto, "Fear is a funny thing"?

-"Tracks, its all about Tracks"

-"Room to Hide"

 

So much to see... O.o

Link to comment
Share on other sites

Opening weekend, so I went peeking (from public areas) through some doors...

 

Door 1 - the suspected Immersive Tunnel end of the building:

 

2016mar16construction4.jpg

 

Door 2 - entrance for the assumed covered train carriage:

 

2016mar16construction6.jpg

 

Door 3 - to the left of the entrance sign

 

2016mar16construction17.jpg

 

Plenty more photos as usual at Total Thorpe Park.

 

I have to say, I'm impressed by the standard of the work so far on the building. Aside from the fact that they're only themeing 60% of it, what they are doing looks really high quality.

 

Bodes well for whatever it is we're getting inside the thing...!

Link to comment
Share on other sites

Hopefully the inside will be as themed as the actual themed portion of the outside?

 

It looks bloody awful, people who say it'll be covered by trees clearly need their eyes testing and didn't notice the massive corner sticking out...

 

Just annoys me so much that they'd do so much effort and then just stop for no real reasoning...

Link to comment
Share on other sites

One does have to wonder why they'd stop where they did, given it's always been the plan and the large sum of money they're putting into this thing. Surely the extra few hundred grand to even partially theme it would have been money well spent, and isn't that much when compared to the rumoured £30-40m budget? So maybe it's not even a budget thing, which leaves me all the more curious...

It is a shame, as the warehouse is really good, and had so much thought put into it. But the red shed does leave some unflattering angles of the attraction, to say the least.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...